Harman Patil (Editor)

Mangrove Creek Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Status
  
Operational

Catchment area
  
101 km²

Length
  
380 m

Primary inflow
  
Purpose
  
Opening date
  
1982

Height
  
80 m

Surface area
  
7 km²

Construction began
  
1978

Mangrove Creek Dam Bonzle showcase Steve777 featured pictures 22 pictures

Owner(s)
  
Central Coast Water Corporation

Similar
  
Balmain Reservoir, Fitzroy Falls Dam, Winburndale Dam, Spring Creek Dam, Wingecarribee Dam

Mangrove Creek Dam, a concrete faced concrete faced rockfill embankment dam, is the primary reservoir for water supply to residents of the Central Coast in New South Wales, Australia.

Contents

Mangrove Creek Dam Mangrove dam level at record high Central Coast Community News

The dam, with a capacity of 190,000 megalitres (6,700×10^6 cu ft) and fed by a catchment area of 101 square kilometres (39 sq mi), is operated by the Central Coast Water Corporation and supplies approximately 93 per cent of water to 300,000 residents in Central Coast Council. The dam was constructed between 1978 and 1982, formed by impounding the headwaters of Mangrove Creek, a tributary of the Hawkesbury River.

Mangrove Creek Dam BluePlanet CFTC WI A snapshot of the Dams of the Central Coast

Mangrove creek dam


Dam and spillway statistics

Mangrove Creek Dam Dam at 25year high and rising Lakes Mail

The concrete faced rockfill embankment dam was built due to a rising demand for water from the expanding population on the Central Coast. The dam was built to boost water supply storage and to help provide a more reliable water supply. Mangrove Creek Dam was built using rolled, soft rockfill of sandstones and siltstones. This material was obtained from a quarry located within the storage area. These sandstones and siltstones were crushed and compacted to form the dam embankment. The embankment also contains approximately 100,000 cubic metres (3,500,000 cu ft) of processed basalt. This material was incorporated into various filters and drains within the embankment to cope with seepage within the embankment and foundations. The concrete face which tapers from 600 millimetres (24 in) at the base to 300 millimetres (12 in) at the crest acts as a seal between the water and the dam embankment. Provision was made to increase the height of the dam wall by 25 metres (82 ft) to a total capacity of 420,000 megalitres (15,000×10^6 cu ft) if the need arose in the future.

The height of the dam wall is 80 metres (260 ft), with a length of 380 metres (1,250 ft).

Mangrove Creek Dam wwwblueplanetnsweduauSiteFilesblueplanetnswe

The dam spillway is a concrete lined chute of approximately 240 metres (790 ft) with a width that tapers from 20 metres (66 ft) to 10 metres (33 ft), with the capacity to discharge a water flow of 570 cubic metres per second (20,000 cu ft/s) into the impounded Mangrove Creek.

Mangrove Creek Dam Mangrove Mountain Groups

During 1989, the Boomerang Creek Tunnel was completed. This tunnel enabled water to be transferred from Mangrove Creek Dam to Wyong River, for extraction at the Wyong River Weir for storage in Mardi Dam. This water was then extracted downstream at Lower Wyong River Weir and pumped for storage in Mardi Dam.

Catchment

Mangrove Creek Dam Water supply up the creek as dam turns into a puddle Environment

Mangrove Creek Dam was proposed as a large storage dam, not primarily a collection dam. Its catchment area was relatively small but the shape of the valley and its geology enabled the construction of a relatively high wall that would store 190,000 megalitres (6,700×10^6 cu ft) of water, reaching a maximum water depth in the reservoir of 65 metres (213 ft).

When at full supply, the reservoir has a surface level of approximately 7 square kilometres (2.7 sq mi), generated from the 101-square-kilometre (39 sq mi) catchment area and annual average rainfall of 960 millimetres (38 in).

Supply levels

Sustained low water conditions, including a 15-year drought, took the level of water to 10.27% of total capacity during February 2007, following an earlier reading of 13.3% during January 2007. Local government officials immediately placed a range of water restrictions on residents and businesses in order to conserve water and ensure ongoing supply to the region's residents and tourism industry. Piping of water from the Hunter River system augmented local water supply.

In 2007, a water plan was established and detailed a program to expand supply and reduce demand to help secure the water supply until 2050.

Between 2010 and 2012, a link was established between the Mangrove Creek Dam and Mardi Dam. This 21-kilometre (13 mi) Mardi-Mangrove Link is made up of two pipelines that enable water to be transferred from the Wyong River and Ourimbah Creek, via Mardi Dam to the large Mangrove Creek Dam for storage, instead of allowing it to flow to the ocean. It is expected that this link will help protect the Central Coast region against future extended periods of below-average rainfall.

Access and recreation

The dam is a popular day trip destination for both locals and tourists for barbecues and picnics, taking about 45 minutes to reach by car from Gosford. Restrictions apply on accessing the dam and the catchment area in order to protect water quality, protect large areas of bush land and plant and animal habitats, protect threatened plants and animal species, and preserve evidence of Aboriginal occupation.

References

Mangrove Creek Dam Wikipedia