Madras Atomic Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
India

Reactor type
  
PHWR

Units under const.
  
1 × 500 MW

Construction began
  
1970

Commission date
  
24 January 1984

Units operational
  
2 × 235 MW

Phone
  
04114 280 130

Madras Atomic Power Station

Operator(s)
  
Nuclear power Corporation of India Ltd

Address
  
Post Office Kalpakkam, Kancheepuram, Tamil Nadu 603102

Similar
  
Anupuram Post Office, Suzuki Motors, NESCO, Ford India Private Limited, Coastal Energen

Madras Atomic Power Station (MAPS) located at Kalpakkam about 80 kilometres (50 mi) south of Chennai, India, is a comprehensive nuclear power production, fuel reprocessing, and waste treatment facility that includes plutonium fuel fabrication for fast breeder reactors (FBRs). It is also India's first fully indigenously constructed nuclear power station, with two units each generating 220 MW of electricity. The first and second units of the station went critical in 1983 and 1985 respectively. The station has reactors housed in a reactor building with double shell containment improving protection also in the case of a loss-of-coolant accident. An Interim Storage Facility (ISF) is also located in Kalpakkam.

Contents

History

During its construction, a total of 3.8 lakh (380,000) railway sleeper (logs) were brought from all over India to lift the 180 ton critical equipment in the first unit, due to lack of proper infrastructure and handling equipment.

As of July 2016 the Prototype Fast Breeder Reactor (PFBR) was in its final construction stage, and was expected to reach criticality in March 2017 with 500 MW of electricity production. The following month the loading of the 1750 ton liquid sodium coolant were expected to happen in four to five months, with sources in the Department of Atomic Energy reporting that criticality would likely be reached only around May 2017.

Reactors

The facility houses two indigenously built Pressurised Heavy-Water Reactors (PHWRs), MAPS-1 and MAPS-2 designed to produce 235 MW of electricity each. MAPS-1 was completed in 1981, but start-up was delayed due to a shortage of heavy water. After procuring the necessary heavy water, MAPS-1 went critical in 1983 and began operating at full power on 27 January 1984. MAPS-2 obtained criticality in 1985 and began full power operations on 21 March 1986.

With India not being a signatory to the Treaty on the Non-Proliferation of Nuclear Weapons the reactors have since 1985 been delivering their spent fuel to the nuclear reprocessing plant at Tarapur, providing the country with unsafeguarded plutonium.

A beachhead at Kalpakkam also hosts India's first indigenous Pressurised (light) water reactor (PWR). The 80 MW reactor was developed by Bhabha Atomic Research Centre (BARC) as the land-based prototype of the nuclear power unit for India's nuclear submarines. This unit does not come under MAPS.

Incidents

The reactors' coolant pipes have been plagued by vibrations and cracking with substantial cracking in the reactor coolant system. This cracking has led to the discovery of Zircaloy pieces in a moderator pump, requiring the power generation to be lowered to 170 MW.

On 26 March 1999 large amounts of heavy water spilled at MAPS-2, exposing seven technicians to heavy doses of radiation.