MEVA Formwork Systems is a worldwide producer of formwork systems. Headquartered in Germany under the name MEVA Schalungs-System GmbH, the MEVA group has 40 subsidiaries, plants and logistics centers on 5 continents.
MEVA designs, constructs, produces and markets frame formwork systems for all types of in-situ concrete applications in the building industry. MEVA’s product portfolio is completed by the company’s service and consulting packages for formwork users.
MEVA was founded in 1970 by Gerhard Dingler. The idea of developing a formwork system that would be re-usable led to the company’s foundation and to the first frame-based panelised formwork system with a facing integrated into a metal frame, the so-called formwork panel. The panels are produced in different sizes and can be freely combined, hence the name modular formwork system. In the course of its history, MEVA developed several innovations, part of which have become standard features in the industry.
The milestones:
1971 – MEVA presents the first modular panelised formwork system.1977 – MEVA invents the formwork clamp that connects panels tightly and firmly.1978 – The frame with hollow profiles and grooves is presented. It is lighter than previous frames, supports a higher fresh concrete pressure and is easier to clean as no dirt can enter the closed hollow profiles.1981 – The first crane-independent formwork system for walls and slabs is marketed.1982 – MEVA’s Mammut wall formwork system is the first heavy-duty system offering a fresh concrete load capacity of 97 kN/m².1989 – MEVA develops the aluminium wall formwork system.1992 – The crane-independent MevaDec slab system offers 3 methods for all types of slabs.2000 – MEVA presents the first all-plastic facing and is the first formwork producer to use this kind of facing in all formwork systems. Contrary to wooden facing, the all-plastic facing lasts as long as the panel frame, can be cleaned with high-pressure cleaners and repaired with identical material on the construction site and delivers a consistently high-quality concrete surface. MEVA’s all-plastic facing alkus comes with a 7-year long term warranty that so far has never been claimed.2012 – MEVA’s automatic climbing system MAC is used on sites in Europe after several years of use in Australia and the Far East.Product and Service Portfolio
MEVA offers standard formwork systems for all types of in-situ concrete applications and also designs and produces special formwork and solutions for special requirements such as irregular building geometries or surfaces without joints. The systems are highly compatible and use identical accessories wherever possible. MEVA offers:
Crane-independent wall formwork systems with aluminium framesCrane-dependent wall formwork for large-size heavy-duty applicationsSupport frames for single-sided wall applicationsformwork systems for columns and curved wallsSlab formwork systemsSafety systems and equipment, e.g. wall formwork systems with integrated platforms and ladder access, folding, pouring and safety-catch platforms, shoring and stair towersClimbing formwork: climbing scaffold, automatic climbing system, guided screens and climbing systemsMEVA is a one-stop supplier for formwork systems and solutions. In line with its slogan “… more than just formwork“ MEVA offers a comprehensive services and consulting package including formwork planning and on-site support with formwork set up, process control and customer staff training. Rental formwork users can choose from different services packages and have their rental formwork inspected, cleaned and repaired by MEVA at MEVA’s industrial cleaning and repair facilities once the formwork is returned from the construction site. Customers with their own formwork inventory can have their formwork regenerated by MEVA and made like new. With its all-plastic facing MEVA formwork delivers high-quality and architectural concrete surfaces. Details about architectural concrete is founded Beside renting and selling new formwork systems MEVA offers used formwork with a double-warranty from the manufacturer. A comprehensive training program with in-depth training and seminars for customers is part of MEVA’s customer services. MEVA is certified according to ISO 9001:2008 and is active in important industry standards committees and organisations such as the American Concrete Institute (ACI) and the German equivalent GSV.
MEVA formwork is used for all types of in-situ concrete work on construction sites all over the world:
Architectural construction
University of Economics and Business, Vienna, AustriaFootball Stadium Pancho Arena, Felcsút/HungaryCivil engineering construction
Football Stadium Pancho Arena, Felcsút/HungaryJVA Augsburg/GermanyLinth–Limmern Power Stations, Linthal/SwissSorenga Tunnel, Oslo/NorwayStuttgart Trade Fair, Stuttgart, GermanyStadionul Naţional, Bucharest, RomaniaVictoria Square, Shopping Centre, Belfast, Northern IrelandLoch Katrine freshwater reservoir, Glasgow, ScotlandMetro M4, Budapest, HungarySaint Petersburg Dam, Saint Petersburg, RussiaHigh-rise construction
Burj Khalifa, Dubai, UAE, The world’s tallest building; 818 m (2,684 ft)Hoffmann-La Roche, Basel, Swiss tallest buildingMarina 101, Dubai, UAEThe Federation Tower, Moscow, Russia. Europe’s tallest office building; 506 m (1,660 ft)Q1 (building) 323 m (1,058 ft), Gold Coast, Queensland, AustraliaPalais Royale, Mumbai, IndiaLilian Tower in Dubai, UAEThe Jazz Residences in Manila, PhilippinesCommercial and residential construction
Hoffmann-La Roche, Basel, Swiss tallest buildingBattersea (Residential complex with 866 apartments at Battersea Power Station in London/UK)University of Economics and Business, Vienna, AustriaMarina 101, Dubai, UAEFootball Stadium Pancho Arena, Felcsút/HungarySorenga Tunnel, Oslo/NorwayWorcester Technical High School, Worcester, Massachusetts USLoch Katrine freshwater reservoir, Glasgow, ScotlandMoorburg Power Station, Hamburg, GermanyOhio University park garage, Athens, Ohio USLeipzig University, Leipzig, GermanyMetro M4, Budapest, HungaryRestoration of the Königsbau, Stuttgart, GermanyHazaa Bin Zayed Stadium, Al Ain, VAECity of Dreams expansion, Macau