Leigh Salford Manchester Bus Rapid Transit

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Began operation
  
3 April 2016

Leigh-Salford-Manchester Bus Rapid Transit

Owner
  
Transport for Greater Manchester

Locale
  
Wigan Salford Manchester

Transit type
  
Guided busway and Bus rapid transit

Website
  
www.tfgm.com/buspriority

Operator(s)
  
First Greater Manchester

The Leigh-Salford-Manchester Bus Rapid Transit scheme in Greater Manchester, England provides transport connections between Leigh, Atherton, Tyldesley, Ellenbrook to Manchester city centre via Salford. The guided busway and bus rapid transit (BRT) scheme promoted by Transport for Greater Manchester (TfGM) opened on 3 April 2016. Built by Balfour Beatty at a total cost of £122 million to improve links from former coalfield towns into Manchester city centre, the busway proposal encountered much opposition and a public enquiry in 2002 before construction finally started in 2013. The branch route from Atherton and extension to the Central Manchester Hospitals were added to the original scheme.

Contents

Twenty-five purple-liveried Wright Eclipse Gemini 3 bodied Volvo B5LH hybrid double-decker equipped with CCTV and next stop audio and visual announcements operate the service. Stops on the guided busway section have level-boarding from platforms equipped with passenger information display screens.

From Leigh, the V1 limited-stop bus service joins 7 km of guided busway to Ellenbrook, 6 km of bus lanes on the East Lancashire Road and sections of reserved bus lanes through Salford and Manchester city centres. The V2 service from Atherton to Manchester joins the guided busway at Tyldesley. The temporary V3 service from Leigh to the Central Manchester Hospitals on Oxford Road that ran from 29 January 2017 will be combined with the V1 on 23 April 2017 when all the Vantage services will continue to the hospitals.

Background

Leigh is one of the largest towns in Britain without a railway station since the closure of the Tyldesley Loopline in 1969 and suffers from poor transport connections to neighbouring towns. A guided busway scheme using a kerbed concrete track was proposed using the former railway trackbed from Leigh to Ellenbrook to improve access to Manchester city centre from Leigh, Tyldesley and Ellenbrook and regenerate areas of the former Lancashire Coalfield. A long legal process preceded the busway's construction, including a public inquiry in 2002. The decision of the public inquiry was delayed because of great crested newts occupying a site on the route. The Department for Transport granted powers to build the busway in 2005 and it was projected to be built by 2009 but preliminary work only started in 2012. Powers to build it are set out in the Greater Manchester (Leigh Busway) Order 2005 in the Transport and Works Act. GMPTE had estimated that the busway would generate around 2 million passenger trips per annum. After the public inquiry, a branch bus route from Atherton to Tyldesley and an extension from Manchester city centre to the Central Manchester Hospitals were added to the scheme.

When proposed, the busway was controversial and encountered much local opposition. It was branded the 'Misguided Busway' by a Salford councillor. Critics contested claims by TfGM that the creation of within-carriageway bus lanes would not reduce general traffic capacity along the East Lancashire Road, a heavily congested radial route for traffic heading towards Manchester and Salford city centres; but instead increase it.

Construction

Site clearance for the dedicated busway section between Leigh and Ellenbrook took place between November 2012 and March 2013. Balfour Beatty began its construction in September 2013. A short section of the busway west of Newearth Road was completed in early 2015 and in the April was used for a trial of the construction method and the bus guidance system. Following delays due to bad weather and other problems, the busway works were rescheduled to be completed before the end of 2015. The service began on 3 April 2016 to coordinate with associated road and tram works in Manchester city centre.

TfGM spent £122 million on bus priority investment of which the guided busway track and infrastructure cost £68 million and the rest was spent upgrading associated local roads, bus lanes and junctions. The Greater Manchester Transport Fund provided most of the funding and the Department for Transport contributed £32.5 million.

Route

The BRT route begins at Leigh bus station, and joins the guided section at East Bond Street. It proceeds through Leigh and along the converted rail alignment via Tyldesley to Newearth Road in Ellenbrook. An improved bus route from Atherton joins the route at Astley Street, Tyldesley. From Ellenbrook the route continues via bus lanes alongside the A580 East Lancashire Road, serving Worsley and Swinton before joining the A6 at Irlams o' th' Height. All stops along the A580 bus lanes are bus bays so that conventional stopping services can be overtaken by limited-stop expresses. It passes Salford University/Salford Crescent railway station before continuing through Manchester city centre and will pass along bus-only lanes on Oxford Road to Manchester University and Central Manchester Hospitals. After 29 January 2017, buses will be able to use Bolton Road in Salford when Broad Street is congested and some afternoon peak-time journeys will take longer.

The guided section has stops at East Bond Street, Holden Road in Leigh and Cooling Lane between Higher Folds and Squires Lane in Tyldesley, Astley Street, Hough Lane and Sale Lane in Tyldesley and Newearth Road in Ellenbrook. The multi-user path for walkers, horse riders and cyclists alongside the guided section provides access for emergency vehicles and maintenance. For cyclists the path from Tyldesley to Ellenbrook is part of the National Cycle Network Route 55.

The route from Leigh to Central Manchester Hospitals has 30 stops and the connecting route from Tyldesley to Atherton has five. In daytime operation from Monday to Saturday at least nine buses per hour run in each direction on the guided section, five on the Leigh to Tyldesley section and four from Atherton joining the Tyldesley to Ellenbrook section. Park and ride facilities are provided at East Bond Street, Astley Street and where the A580 road passes under the M60 motorway carriageway.

Service

First Greater Manchester runs the service, branded Vantage. Services V1 and V3 operate from Leigh and V2 from Atherton. Timetabled journey times are 50 to 65 minutes from Leigh and Atherton to Manchester city centre. V1 and V2 services both run every 15 minutes to a temporary terminus at Stevenson Square in Manchester city centre. The earliest weekday departures from Leigh/Atherton are at 04:00/04:30 respectively; and last trips from Manchester are at 24:00/23:45.

The V3 service terminating at the hospitals was introduced in January 2017. It provides extra journeys at peak times in the morning and afternoons and in between an hourly off-peak service. When bus priority works on Oxford Road are completed, the Vantage services will no longer operate to Stevenson Square but will terminate at the hospitals from 23 April 2017 when the V1 and V3 services will be combined.

The introduction of the Vantage services resulted in the withdrawal of a number of services by operator First. Others were amended to join the A580 bus lanes east of Boothstown.

Operation

After light-controlled junctions along the East Lancashire Road were upgraded with SCOOT adaptive signalling in July 2016, TfGM reported in the October that traffic journey times on this section had returned to pre-construction levels in the morning peak while accommodating significant additional traffic.

In the first six months of operation, more than 900,000 passenger journeys were made. A survey of users published in October 2016 revealed that 20% of passengers had switched from travelling by car for the same journey, and nearly all respondents would recommend the service. The service attracted about 28,000 passengers per week when it started in April 2016 rising to 45,000 by the autumn and 55,000 in the run up to Christmas. The numbers returned to autumn levels in January.

Buses

Services were initially operated by 20 Wright Eclipse Gemini 3 bodied Volvo B5LH hybrid double-decker buses in purple-livery. They are equipped with CCTV and next stop audio and visual announcements, USB charging points and free Wi-Fi. Five more buses were purchased in January 2017 to provide extra capacity at busy times and facilitate the extended service to Central Manchester Hospitals.

Stops, signalling and ticketing

Stops along the guided busway section provide level-boarding from platforms and are equipped with passenger information display screens. The guided busway crosses local roads on level, light-controlled junctions at which busway services have priority. No special ticketing system exists for the service and ticketing operates just as per other First buses in the TFGM area.

Awards

The scheme won the Transport Policy, Planning and Implementation award at the Chartered Institute of Logistics and Transport North West Awards and the award for sustainability at the 10th annual North West Construction Awards in 2016. The launch of the Vantage service won the Transport Project of the Year category and the Leigh to Ellenbrook Guided Busway section was the winner in the Construction and Engineering category at the National and the North of England Transport Awards in December 2016.