La Grande 1 generating station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
Centrale La Grande-1

Location
  
Opening date
  
1994-1995

Height
  
25 m

Province
  
Québec

Construction cost
  
2.5 billion CAD

Country
  
Status
  
Operational

Type of dam
  
Barrage

Opened
  
1995

Owner
  
Construction began
  
1989

La Grande-1 generating station httpswwwquebecoriginalcomenlistingimages8

Similar
  
Robert‑Bourassa generating station, La Grande‑4 generatin, Laforge‑2 generating station, Laforge‑1 generating station, Centrale de la Première

The La Grande-1 is a hydroelectric power station on the La Grande River that is part of Hydro-Québec's James Bay Project. The station can generate 1,436 MW and was commissioned in 1994–1995. A run of the river generating station, it is one of only two generating stations of the James Bay Project that use a reservoir without any major water-level fluctuations (the Laforge-2 generating station is the other). Thus, the amount of electricity generated by the station depends almost entirely on the water-flow of the river, which is largely controlled by upstream reservoirs and generating stations.