Harman Patil (Editor)

Kururi Line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Stations
  
14

Operator(s)
  
JR East

Rolling stock
  
KiHa E130 series

Locale
  
Chiba Prefecture

Opened
  
1912

Depot(s)
  
Kisarazu

Line length
  
32.2 km (20.0 mi)

Kururi Line httpsuploadwikimediaorgwikipediacommonsthu

Terminis
  
Kisarazu Station, Kazusa-Kameyama Station

e130 jr east kururi line kiha e130 series dmu


The Kururi Line (久留里線, Kururi-sen) is a railway line in Chiba Prefecture, Japan, operated by the East Japan Railway Company (JR East). It connects Kisarazu Station in Kisarazu to Kazusa-Kameyama Station in Kimitsu. The railway route extends through three cities, Kimitsu, Kisarazu, and Sodegaura. It has no double-track section, and trains can pass at only two stations, Yokota Station and Kururi Station.

Contents

Rolling stock

  • KiHa E130-100 series DMU cars x10 (from 1 December 2012)
  • Former rolling stock

  • KiHa 30 DMU
  • KiHa 37 DMU
  • KiHa 38 DMU
  • History

    The Chiba Prefectural Government opened the 762 mm (2 ft 6 in) gauge section from Kisarazu to Kururi as a light railway on 28 December 1912.

    In 1922, the Railway Construction Act was amended by the Diet, and a new rail line connecting Kisarazu Station to Ōhara Station on the Sotobō Line via Kururi and Ōtaki, to transect the Bōsō Peninsula, appeared on the list as compensation for the underdeveloped network of roads in the area at that time.

    On 1 September 1923, the Kisarazu to Kururi Line was nationalised, and the line was named the Kururi Line under the Japanese Government Railways (JGR) system. On 20 August 1930, the track gauge was widened to 1,067 mm (3 ft 6 in), and on 25 March 1936, the line was extended to Kazusa-Kameyama Station.

    The private Kihara Line from Ōhara Station was extended to Kazusa-Nakano Station in 1934, and it was planned that the Kururi Line and the Kihara Line would be connected to form a single route across the Bōsō Peninsula (which would have been named the Kihara Line). However, due to World War II, the plan was abandoned, and Kururi Line was never to be extended into the most mountainous area of the peninsula. Services on the section from Kururi Station to Kazusa-Kameyama Station were suspended from 1944 to 1947.

    New KiHa E130-100 series DMU trains are scheduled to be introduced from 1 December 2012, replacing the ageing KiHa 30/37/38 DMUs.

    References

    Kururi Line Wikipedia