Kalpana Kalpana (Editor)

Kurduvadi Junction railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Owned by
  
Indian Railways

Structure type
  
Standard on ground

Opened
  
1859

Owner
  
Indian Railways

Operated by
  
Central Railway

Parking
  
Yes

Elevation
  
516 m

Platforms in use
  
4

Kurduvadi Junction railway station

Location
  
State Highway 149, Kurduvadi, Maharashtra India

Line(s)
  
Mumbai-Chennai line Mumbai Dadar-Solapur section

Address
  
Bagal Nagar, Kurduwadi, Maharashtra 413208

Similar
  
Daund Junction railway st, Solapur railway station, Latur railway station, Lonavala railway station, Miraj Junction railway st

Kurduvadi railway station is located in Solapur district in the Indian state of Maharashtra and serves Kurduvadi. It is a junction station at the intersection point of the Mumbai-Chennai line and the Latur-Miraj line.

Contents

History

Starting with the first train in India from Chhatrapati Shivaji Terminus in Mumbai to Thane on 16 April 1853 on a track laid by the Great Indian Peninsula Railway, Pune was linked with Mumbai with the completion of the railway track across the Bhor Ghat inclinebetween Palasdari to Khandala in 1862. GIPR extended its line to Raichur in 1871 and met the line of Madras Railway thereby establishing direct Mumbai-Chennai link.

The Pune-Raichur sector of the Mumbai-Chennai line was opened in stages: the portion from Diksal in Pune to Barshi Road was opened in1859, from Barshi Road to Mohol in 1860 and from Mohol to Sholapur also in 1860. Work on the line from Sholapur southwards was begun in 1865.

Barsi Light Railway was a 202-mile (325 km) long, 2 ft 6 in (762 mm) wide railway from Kurduvadi to Latur. It was opened in 1897 on a 22-mile (35 km) long railway track from Barsi Road to Barsi, and extended in stages.The narrow gauge line from Barsi Road to Pandharpur was extended to Miraj in 1927.

Gauge conversion from 2 ft 6 in (762 mm) to 5 ft 6 in (1,676 mm) of the Miraj-Latur track and extension of the new line to Latur Road was taken up in 1992 and completed in stages. The last phase of the 375-kilometre (233 mi) long project was completed in 2008.

Electrification

The Pune-Solapur-Wadi line is being electrified with a loan of Rs. 1,500 crore from Asian Development Bank. Work was initiated in 2012.

Track doubling

The railway track in the Daund-Wadi sector is being doubled at a cost of Rs. 700 crore.

Amenities

Kurduvadi railway station has a public call office booth with facilities for subscriber trunk dialling, refrehment stalls serving vegetarian and non-vegetarian food, retiring room, waiting room and book stall.

Workshop

Kurduvadi Workshop was set up for repair of narrow gauge steam locomotives, coaches and wagons by Barsi Light Railway in 1930. With the reduction in narrow gauge rolling stock, the Workshop has taken up new activities as per requirements. Kurduvadi Workshop now undertakes rehabilitation of 20 broad gauge wagons per month.

Kurduvadi had a narrow gauge diesel loco shed for Barsi Light Railway. The shed was closed down after conversion of the narrow gauge railway.

References

Kurduvadi Junction railway station Wikipedia