Suvarna Garge (Editor)

Kirkby railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Kirkby

Station code
  
KIR

DfT category
  
E

Number of platforms
  
2

Grid reference
  
SJ402992

Managed by
  
Merseyrail

2011/12
  
1.891 million

Pte
  
Merseytravel

Kirkby railway station

Address
  
Liverpool L32 0XQ, United Kingdom

Local authority
  
Metropolitan Borough of Knowsley

Similar
  
Wigan Wallgate railway st, Hunts Cross railway st, Orrell railway station, Southport railway station, Moorfields railway station

Kirkby railway station is situated in Kirkby, Merseyside, England. The station is an interchange between Merseyrail services from Liverpool Central and Northern services from Manchester Victoria via Wigan Wallgate. It is situated 7.5 miles (12km) north-east of Liverpool Central and is the operational terminus of both the Kirkby branch of Merseyrail's Northern Line and the Kirkby Branch Line from Wigan.

Contents

History

The original station was built in 1848, as part of the Liverpool and Bury Railway (later part of the Lancashire and Yorkshire Railway system). The station was situated on the western side of the bridge that bisects the site and consisted of two platforms. The L&BR subsequently became part of the main L&YR route between Manchester Victoria & Liverpool Exchange and prior to the 1923 Grouping carried fast expresses between the two cities in addition to sizeable volumes of local passenger traffic and freight. After the nationalisation of the railway network in 1948, the use of the line as a through Liverpool to Manchester route declined but local commuter traffic levels remained significant (19 trains per day each way ran along the line in 1965, though a few ran non-stop between Liverpool & Wigan). This nevertheless didn't stop the station & line from being listed for closure in the 1963 Beeching Report (along with the neighbouring Liverpool to Southport commuter line). The closure plans were subsequently rejected by the government in December 1967 and the station then became part of the newly created Merseyside Passenger Transport Executive's rail network in 1969. From the following year, the line through the station was singled to reduce track maintenance costs, with the Wigan-bound platform being taken out of use.

It was then rebuilt in 1977, when the line from Liverpool was electrified. Electric operations commenced on 2 May of that year, along with the end of through running between Bolton/Wigan and Liverpool.

The station configuration was altered due to the closure of the former L&Y terminus at Liverpool Exchange on 30 April 1977. Its replacement with new underground stations at Moorfields & Central meant that the diesel services from Manchester, Bolton & Wigan serving the station could no longer operate beyond Sandhills as Diesel Multiple Units were banned from operating in the new tunnels for safety reasons. In order to maintain a through service to the city, the section from Walton Junction was third-rail electrified, with the remainder of the line towards Rainford and Wigan remaining diesel operated and the station here becoming the interchange point between the two (further electrification eastwards being deemed too expensive at the time).

The modern station consists of a single platform on either side of the road overbridge, with a ticket office & waiting room at street level. The single track is broken up by a large buffer stop, which separates the electric Merseyrail trains from the diesel-run Northern services. Passengers wishing to go from one to another must walk a dozen yards or so along the platform to move between trains (a similar layout exists at Ormskirk). This layout was adopted both to avoid the need for through travellers to change platforms when changing trains and also for operational convenience - the lines to Fazakerley and Rainford are both single track (as noted previously), which facilitates the easy turnaround of trains here.

Facilities

The ticket office is manned throughout the day, from start of service until 00:30 seven days per week. A self-service ticket machine is also provided. There are shelters on both sides of the split platform, along with digital display screens and timetable poster boards. Step-free access to the platform is available via ramp. There is a 174 space car park and secure cycle parking for 20 cycles.

Services

Services to Liverpool Central operate frequently, running every 15 minutes during the day (Monday-Saturday) and every 30 minutes at other times with a Saturday service operating on most Bank Holidays.

Services to Wigan Wallgate and Manchester Victoria operate less frequently, usually once per hour.

There is no evening (after 19:30) or Sunday service but a normal service operates on most Bank Holidays. Most trains used continue to Rochdale prior to the December 2008 timetable change, but more recently ran to/from Stalybridge. Since the May 2014 changes though, most trains now run through to/from Rochdale again and since May 2015 continue onwards to Blackburn via Todmorden via the Caldervale Line. Trains from Manchester normally start at Victoria, though one runs through from Buxton in the morning peak. The last departure of the day terminates at Wigan.

Headbolt Lane and planned extension

As part of the second Merseyside Local Transport Plan (covering expansion of public transport in the region from 2006 to 2011), plans were drawn up for the possible future expansion of the electrified line beyond the existing station. Since the existing track at Kirkby station makes interchange difficult, part of the expansion involves the construction of a new station in the Northwood area of the town. This new facility, at Headbolt Lane - previously planned in the early 1970s but never built - would provide "turn-back" platforms for both diesel and electric services (likely in an island platform configuration). Exploratory technical assessments have already been carried out and Merseytravel have aspirations to construct the station as part of the Liverpool City Region Long Term Rail Strategy published in 2014. As of 2017 however, the scheme remains unfunded and no date has been set for work to begin. Merseytravel's desire to serve Skelmersdale via this route may also see the plans for the station modified.

References

Kirkby railway station Wikipedia


Similar Topics