Existed: January 2010 – present East end: Pejagan Constructed January 2010 | West end: Kanci Length 36 km Major cities Cirebon | |
History: In 2010, the toll road is acquired by Bakrie toll road until 2013in 2013, The toll road is acquired by MNC Land |
Kanci–Pejagan toll road is a toll road connected Cirebon and Brebes. The toll road is also included in Indonesian National Route 1 and Trans-Java toll road. The toll road was opened on 26 January 2010. The toll road is operated by Bakrie toll road. The length of this toll road is about 36 kilometres. In 2013, the toll is acquired by MNC Land.
Contents
Map of Jalan Tol Kanci - Pejagan, Indonesia
Emergency toll road
Due to traffic during holidays, the emergency toll road, Pejagan–Pemalang Toll Road will be opened.
References
Kanci–Pejagan Toll Road Wikipedia(Text) CC BY-SA