John Tonge Centre

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
John Tonge Centre cdnnewsapicomauimagev1004488d04b841a47938750

Similar
  
Brisbane River, State Library of Queensland, HMAS Diamantina, Bulimba Creek, Pumicestone Passage

Concern funding cuts and job cuts at forensic john tonge centre are delaying court hearings


The John Tonge Centre is the mortuary for Queensland Health Forensic and Scientific Services (FSS - formerly Queensland Health Scientific Services) and responsible for conducting autopsies in Brisbane (and much of South-East Queensland in Australia) on people whose deaths make them subject to the Coroner's Act. Such deaths include accidents, suicides, homicides, deaths during surgery and anything for which a doctor is unwilling to issue a medical cause of death certificate for. In cases when the family is called upon to attend the Centre to identify a loved one counselling services are generally available. The John Tonge Centre performs some 1,200 autopsies annually and is adjacent to the Queen Elizabeth II Jubilee Hospital on Kessels Road in Coopers Plains.

Contents

History

From 1879 until 1992 the Brisbane morgue occupied five different sites on the north bank of the Brisbane River. The building was flooded in 1887, in the 1890 flood it collapsed into the Brisbane River then in the 1893 flood it was washed away. It was then reconstructed further downstream at Gardens Point. Finally, in 1992 the morgue moved to the John Tonge Centre at Coopers Plains. The John Tonge Centre was opened officially by the Right Honourable Mr Wayne Goss, Premier of Queensland, on 11 December 1992, and commenced operations on 11 January 1993.

Criticism

There have been accusations of long delays in DNA testing for criminal cases and further accusations about poor treatment of the dead. In 2005 an employee of the centre was under investigation regarding stolen body parts, based on written accusations by colleagues from some years before.

A twenty-six million dollar construction operation was undertaken to help rectify the existing problems and the John Tonge Centre now has an annual budget of forty-five million dollars with a massive resulting reduction in the DNA backlog.