Neha Patil (Editor)

Interstate 90 Grand River bridges

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Carries
  
I-90

Locale
  
Lake County, Ohio

Material
  
Girder bridge

Carry
  
Interstate 90

Crosses
  
Grand River

Location
  
Lake County, Ohio

Body of water
  
Grand River

Preceded by
  
Two cantilever truss bridges

Similar
  
CSX Bridge, Smolen–Gulf Bridge, Great Lakes Mall, Squire's Castle, Kirtland Temple

The Interstate 90 Grand River bridges are two steel girder bridges in Lake County, Ohio, on the Leroy Township/Perry Township boundary southwest of Madison, carrying Interstate 90 (I-90) over the Grand River.

Former bridges

The I-90 bridges replace two cantilever truss bridges at the same location. Built in 1960, they were 869 feet (265 m) in length and 150 feet (46 m) in height.

On May 24, 1996, a gusset plate failed on the eastbound span, similar to the later failure on the I-35W Mississippi River bridge in Minneapolis, Minnesota in 2007, prompting the Ohio Department of Transportation to close the bridge later that day and divert traffic; the cause originally was attributed to an overloaded semi-trailer truck. The detour followed the State Route 44 and State Route 2 freeways, U.S. Route 20, and State Route 528, the latter which traverses downtown Madison. With the roads near the east end of the detour not equipped to carry the increased traffic, police officers from the village of Madison were dispatched to three intersections for traffic control. The detour lasted until the following month, when highway crossovers on each side of the damaged bridge permitted eastbound traffic to use the westbound span with westbound traffic. The eastbound span was repaired throughout the rest of the year and reopened on November 4.

In a project authorized in 2002 and lasting from March 2007 to July 2010, the old bridges were demolished. The eastbound span was demolished starting September 28, 2008, allowing the new westbound span to be built in its place, and the old westbound span was demolished beginning in late 2009 and finishing the morning of February 14, 2010.

References

Interstate 90 Grand River bridges Wikipedia