Supriya Ghosh (Editor)

Inner City Bypass, Brisbane

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Highway

North end
  
Albion

Major suburbs
  
Bowen Hills

Via
  
Bowen Hills

Route number(s)
  
M3

South end
  
Brisbane

Length
  
5 km

Inner City Bypass, Brisbane

M3 Inner City Bypass (ICB) is a major motorway standard road in Brisbane, Queensland. The 4.5 kilometres (2.8 mi) bypass is north of the city. Bypassing the Brisbane central business district, it connects Brisbane’s Pacific Motorway and Go Between Bridge at Hale Street to Kingsford Smith Drive, the Clem Jones Tunnel and Lutwyche Road following the Exhibition railway line for the majority of its length.

Contents

Map of Inner City Bypass, Queensland, Australia

The route is marked as the M3 from the western part of the route, to the Horace Street interchange.

The motorway cost $220m to complete and incorporates a total of six lanes, four tunnels, 18 bridges and was the largest infrastructure engineering project undertaken in Queensland for decades. The route also includes a 350m long tunnel under the RNA Showgrounds. There is no toll for use of this roadway.

The ICB, built by the Brisbane City Council, is considered one of the most successful road projects in Brisbane, completed well before schedule, on budget, and to date is one of the most used road corridors in the city.

Construction

The Inner City Bypass was built in 3 stages:

  • Stage 1 – Hale Street to Campbell Street which opened during November 2001
  • Stage 2 – Campbell Street to Abbotsford Road which opened during February 2002
  • Stage 3 – Abbotsford Road to Kingsford Smith Drive which opened during July 2002
  • Exits and Interchanges

    The road is within the local government area of the City of Brisbane.

    Future interconnectivity

    Although not constructed as part of the TransApex project, the ICB is an integral part of the future connection of tunnels and other planned urban motorways within the city. The Inner City Bypass has also been connected to the Airport Link and the Legacy Way tolled tunnels.

    The Airport Link was completed in mid-2012 and the Legacy Way in late June 2015.

    References

    Inner City Bypass, Brisbane Wikipedia


    Similar Topics