Status Complete Completed early 2014 Floor count 81 Construction started 2009 Opened 24 July 2013 | Type Serviced Apartments Roof 249 m (817 ft) Height 249 m Floors 81 | |
![]() | ||
Similar Soleil, Brisbane Skytower, Aurora Tower, Riparian Plaza, Skyline Apartments |
The Infinity Tower is a 249-metre (817 ft) skyscraper by Meriton recently constructed at 43 Herschel Street Brisbane, Australia. It was the tallest building in Brisbane until it was surpassed by 1 William Street in 2016.
Contents
Map of Infinity Tower, Brisbane City QLD 4000, Australia
It contains 81 levels of serviced apartments and residential apartments totalling 549 units. It is situated on a relatively small site and is part of the North Quarter district of the Brisbane CBD. It is close to Roma Street railway station, King George Square, Queen Street Mall and the Treasury District. It is also close to the Kurilpa Bridge which gives access to South Bank Parklands and the Queensland Cultural Centre.
When measured by roof, the Infinity Tower is the fourth tallest building in Australia behind the Eureka Tower, Prima Pearl and the Rialto Towers which are all located in Melbourne, Australia. It is also currently the tallest building to roof in Queensland after surpassing the Q1 although the Q1 is still taller by spire.
Facilities available to tenants will include a spa, lap pool, private gym, sauna and an efficient lift system.
Nearly two-thirds of the building's apartments had been sold as of February 2013.
Construction
Excavation began in November 2009 after Meriton purchased the site, which was formerly a ground level carpark, for A$25 million.
In March 2012, Meriton applied for permission from the federal Department of Infrastructure and Transport to operate a crane at a height of 311 m after the Brisbane City Council approved the addition of four storeys to the design.
The building was officially opened by former Queensland Premier, Campbell Newman and Meriton boss, Harry Triguboff on 24 July 2013. Levels 25 to 64 had been progressively completed from November 2013 and the overall construction was finished in early 2014.