Harman Patil (Editor)

Ikata Nuclear Power Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Japan

Reactor type
  
PWR

Phone
  
+81 894-39-1702

Status
  
Operational

Cooling source
  
Iyo-nada Sea

Construction began
  
1 September 1973

Ikata Nuclear Power Plant

Commission date
  
September 30, 1977 (1977-09-30)

Operator(s)
  
Shikoku Electric Power Company

Address
  
3-40-3 Kucho, Ikata, Nishiuwa District, Ehime Prefecture 796-0421, Japan

Similar
  
Sendai Nuclear Power Pl, Takahama Nuclear Power Pl, Genkai Nuclear Power Pl, Mihama Nuclear Power Pl, Tomari Nuclear Power Pl

The Ikata Nuclear Power Plant (伊方発電所, Ikata hatsudensho, Ikata NPP) is a nuclear power plant in the town of Ikata in the Nishiuwa District of Ehime Prefecture, Japan. It is the only nuclear plant on the island of Shikoku. It is owned and operated by the Shikoku Electric Power Company. The plant was shutdown along with all other nuclear plants in Japan following the Fukushima Daiichi nuclear disaster. Unit 3 was reactivated using plutonium-uranium mixed oxide fuel on 12 August 2016 and began providing electricity to the grid three days later.

Contents

The plant is on a site with an area of 860,000 m2 (212 acres); 47% of the site is "green", by comparison the non-nuclear plants Shikoku Electric operates are 13.8, 20.1, 21.2 and 45.5%.

Accidents

On March 3, 2004 there was a coolant leak in Unit 3.

Technical achievements

On August 13, 2003 the maximum burnup for spent fuel was changed from 48,000 MWd/ton to 55,000 MWd/ton.

In January 2006 Mitsubishi Heavy Industries announced the completion of the replacement of the internal structure of the No.1 reactor. It was the world's first all-in-one extraction and replacement of the core internals of a PWR reactor. The upper and lower internals of the reactor were replaced in order to accommodate more control rods and allow for higher fuel burnup.

In 2010, a partial MOX fuel core was loaded into the No.3 reactor for the cycle beginning February 24, 2010.

Maintenance in 2011

On Sunday 4 September reactor no. 1 was shut down for regular inspections. These check-ups would last at least three months. At that time reactor No.3 was also shut down, although the normal inspections were long time finished before September. To resume operation, a stress test was required for all suspended reactors by the government, after the accidents in Fukushima. The Ehime prefectural government said it would decide whether to approve the resumption of operations after the results of the safety test came out. The Shikoku Electric Power Company said that if the No. 3 reactor did not resume operations, power supplies would be very tight in winter when electricity demand would be high. It was considered to restart a thermal power-plant which had been long out of use.

Nuclear evacuation drill held in 2012

In February 2012 an evacuation drill was held in the prefecture Ehime and Shimane. The drill was done to mimic the situation of a reactor cooling failure after a huge earthquake. The evacuation-zones were expanded from 10 to 30 kilometers after the disaster in Fukushima Daiichi nuclear power plant. In this evacuation drill some 10.000 people were taken out of the area round the nuclear power plant, with buses, helicopters and boats of the Maritime Self-Defense Force. The residents in the town of Ikata, commanded by disaster announcements on the radio to gather at a junior high school. From there they were taken by buses to a shelter some 50 kilometers further. This drill was the very first ever executed on this scale, and it was also the first time that so many people were evacuated out from their town.

Unit 3 restart in 2016

On 19 April 2016, unit 3 received from NRA the final approval to restarting. On 27 June, Shikoku Electric completed loading 157 fuel assemblies, of which 16 uranium-plutonium mixed oxide (MOX). Unit 3 achieved criticality on 13 August and resumed commercial service on 7 September.

References

Ikata Nuclear Power Plant Wikipedia