701

Laid down
  
September 2003

Construction started
  
September 2003

Length
  
163 m

Builder
  
Mazagon Dock Limited

Namesake
  
Kolkata

Way number
  
D63

Acquired
  
10 July 2014

Launched
  
30 March 2006

Displacement
  
6.804 million kg

INS Kolkata economictimesindiatimescomthumbmsid40247750w

INS Kolkata is the lead ship of the Kolkata-class stealth guided-missile destroyers of the Indian Navy. She was constructed at Mazagon Dock Limited (MDL), and was handed over to the navy on 10 July 2014 after completing her sea trials. The ship was officially commissioned by Prime Minister Narendra Modi in a ceremony held on 16 August 2014.

Contents

INS Kolkata INS Kolkata Biggest Naval Destroyer Still Not BattleReady

Construction

INS Kolkata INS Kolkata To Be Commissioned by PM Still Not BattleReady Photo

The keel of Kolkata was laid down in September 2003 and she was launched on 30 March 2006. Her commissioning was originally planned for 2010, but this was delayed to 16 August 2014 as a result of a series of project delays. During her construction at MDL, she was given the designation Yard-701.

Sea trials

INS Kolkata PM Modi inducts INS Kolkata says military prowess biggest deterrent

The commissioning of Kolkata was delayed from 2010 to 2014 due to delays in her construction and technical problems which were found during her sea trials. The issue detected was generation of additional noise, which occurred when the engine, gear box and the shaft were operated together, but which worked issue-free when run independently. The issues were fixed and the sea trials were completed by February 2014, when the ship returned to MDL to undergo minor work before delivery.

2014 carbon dioxide leak

INS Kolkata India welcomes its first homebuilt warship PM Modi commissions INS

On 7 March 2014, during a complete check-up of the ship's machinery to fix the problems found during sea trials, a naval officer was killed and several workers were injured when a valve on a CO2 bottle malfunctioned during a test of the vessel's carbon dioxide fire-fighting unit at the Mazagaon dockyard. For the test, fire-retarding carbon dioxide gas was to be released into a compartment; the test was part of the destroyer's delivery trials. Kolkata's engineering officer-designate, Commander Kuntal Wadhwa, inhaled a large amount of gas and was rushed to St George's Hospital, where he was pronounced dead. Two dockyard officials who also inhaled the gas were also taken to hospital for treatment. MDL stated that the incident will not delay the scheduled commissioning of the ship.

Weapon trials

INS Kolkata INS Kolkata Wikipedia

As part of her pre-commissioning weapon trials at sea, Kolkata test-fired a BrahMos missile off Karwar's coast on 9 June 2014, and the test met all parameters. On 15 February 2015, BrahMos missile was on test fired from INS Kolkata during the Tropex exercise in the Arabian Sea.

On 29 December 2015 and 30 December 2015 the Indian Navy successfully test-fired the Barak 8 missile from INS Kolkata. Two missiles were fired at high speed targets, during naval exercises being undertaken in the Arabian Sea.