Status
  
Under construction

Height
  
35 m

Construction began
  
January 2014

Opening date
  
October 2019

Catchment area
  
3,625 km²

Impound
  
Gulpur Hydropower Project PRIVATE POWER amp INFRASTRUCTURE BOARD

Official name
  
Gulpur Hydropower Plant

Location
  
Gulpur, Kotli District, Kotli Town of AJK, Pakistan

Type of dam
  
Impounds
  
Poonch River, a tributary of Jhelum River

Owner
  
Water and Power Development Authority

Similar
  
New Bong Escape Hydropo, Karot Hydropower Project, Patrind Hydropower Plant, Suki Kinari Hydropower Project, Golen Gol Hydropower Project

Gulpur Hydropower Plant (GHPP) is an under construction, run-of-the-river hydroelectric generation project located on Poonch River, a major tributary of Jhelum River near Gulpur in Kotli District of Azad Kashmir, Pakistan. The site is about 167 km from Federal Capital Islamabad and 285 kilometres (177 mi) from Punjab's Provincial Capital Lahore and is approachable directly from Islamabad and Lahore by a two-lane, all weather paved, partly mountainous road. The location of the Project is about 28 km upstream of Mangla Dam Reservoir.

Contents

Gulpur Hydropower Project Gulpur Hydro Power 100 MW Project MIRA POWER Limited

Gulpur Hydropower Project is a run-of-the-river project designed for the generation of 100 megawatts (130,000 hp) consisting of two Francis-type turbine units with average energy output of 436 Gwh. Gulpur Hydropower Project is a part of least-cost energy generation plan, being executed by WAPDA to harness the indigenous hydropower resources of the country. WAPDA awarded the contract to MIRA Power Limited, a subsidiary of Korean company KOSEP, an independent power producer (IPP) being developed in private sector on BOOT basis (Build, Own, Operate and Transfer) under Government of Pakistan Policy for Power Generation Projects 2002 as adopted in Azad Jammu & Kashmir. The project has the capability of generating an average annual energy of 465 GWh.

Gulpur Hydropower Project 50 million to be invested in Gulpur Hydropower Project IBEX

Background and construction

Gulpur Hydropower Project wwwmirapowercomwpcontentfancygalleryfasign

Gulpur Hydropower Project is the third independent hydropower project in Pakistan. Korean company has also been awarded other contracts to build hydropower plants in the country on BOOT basis i.e. under construction 150 MW Patrind Hydropower Plant and 100MW Kotli Hydropower Project.

Gulpur Hydropower Project Gulpur Hydropower Project Pakistan AECEN

The sponsor of the project is Korean South East Power Company along with Daelim Industrial Co., Ltd. and Lotte Engineering and Construction Co., Ltd.. The Construction of the Project has been awarded to a Joint Venture between Daelim and Lotte.

Gulpur Hydropower Project MPL signs EPC contract for Gulpur Hydropower Project MIRA POWER

Construction of Gulpur Hydropower Plant commenced in September 2014 and the project is expected to be completed in early 2019. The total cost of the project is about PKR 34 billion. Gulpur Hydropower Project is part of the least-cost energy generation plan of the Government of Pakistan. It is being executed on priority basis to harness indigenous hydropower resources to improve the ratio of hydel electricity in the national grid and help provide relief to the consumers.

Gulpur Hydropower Project Formal opening set for Georgia39s 87MW Paravani hydroelectric

On its completion, Gulpur Hydropower project will generate about 465 Gwh of inexpensive electricity annually to earn revenue of about Rs 1 billion. Being an environment friendly hydropower project, it will help reduce dependence on expensive thermal power, thereby saving foreign exchange amounting to $36 million (equivalent to Rs 3 billion) to the country. According to estimation, Gulpur hydropower project will add about Rs 10 billion per annum to the national economy through socio-economic uplift in the country caused by the project. The Asian Development Bank (ADB) is providing the loan to Mira Power, run by three Korean companies, which will build and operate a 102MW hydropower plant.

Salient Features

Basin and Reservoir
◦ Catchment Area 3,625㎢
◦ NHWL EL.540.0m
◦ L.W.L EL.538.0m
◦ 100yr frequency flood 13,340㎥/s
◦ PMF 21,640㎥/s
◦ Reservoir Capacity(NHWL) 21.893 million㎥

Main Dam
◦ Type CGD
◦ Design Flood 21,640㎥/s(PMF)
◦ Height 35.0m
◦ Crest EL.545.0m
◦ Length 238.0m

Spillway
◦ Radial Gate Size W10.0m×7Gates (EL.518.0m)
◦ Under Sluice Gate Size W10.0m×4Gates (EL.515.0m)
◦ Energy Dissipation Submerged Bucket

River Diversion
◦ Type Partial cofferdam(1st) + Sheet File(2nd)
◦ Design Flood 2,517㎥/s (25yr frequency)

Intake Weir
◦ Gate Nos. 2 EA
◦ Gate Size 10.0 × 12.0m

Headrace Tunnel
◦ Size D=7.75m
◦ Type Modified horseshoe(Concrete lined)
◦ Length 3,063.5m

Surge Tank
◦ Type Simple Type
◦ Size D=29.0m(Circular)
◦ Height 54.0m
◦ Max Upsurging Level EL.556.523m
◦ Max Downsurging Level EL.525.986m

Vertical Pressure Tunnel
◦ Type Circular (Concrete Lined)
◦ Length 44.6m

Horizontal Pressure Tunnel
◦ Type Circular (Concrete Lined)
◦ Length 71.7m

Steel Penstock
◦ Type Circular (Steel Lined)
◦ Length 11.2m × 1EA 28.9m × 3EA

Powerhouse
◦ Size W74.0m × L31.5m
◦ Turbine Type Francis
◦ Installed Capacity 100MW
◦ Annual Generation 465 GWh
◦ Plant Discharge 194㎥/s

Tailrace Channel
◦ Type Open Channel
◦ Length 50.0m
◦ Width 45.0m

References