Neha Patil (Editor)

Grassington and Threshfield railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Grid reference
  
SD994638

Platforms in use
  
2

Area
  
Craven

Pre-grouping
  
Grassington & Threshfield railway station httpsuploadwikimediaorgwikipediaenthumb2

30 July 1902
  
Opened as "Grassington"

Similar
  
Bolton Abbey railway st, Embsay and Bolton Abbey St, Skipton railway station, Bolton Abbey, Wensleydale

Grassington & Threshfield railway station (or Threshfield station) was a railway station that served the villages of Grassington and Threshfield, in North Yorkshire, England.

Contents

History

The station was built in the early part of 1902 by the Yorkshire Dales Railway for the Midland Railway. The line diverged from Embsay Junction, up through the Dales, with a stopping station at Rylstone, past the then 'Swinden Lime Works' - today known as Swinden Quarry, and then a further 3 miles (4.8 km) to Threshfield Station. The line was built to provide better links for local villages to the nearby town of Skipton. There were other proposals to continue the line further up the Dales. It would continue north to Kettlewell and thence to Leyburn and would join with the station at Hawes on the Wensleydale Railway. The station had two platforms with run-round loops for each platform, a goods shed with its own siding and a cattle dock with its own siding. A single track route went off over towards Skierthorns Quarry but only went as far as the rear of a set of terraced houses known as Woodlands Terrace. Here the stone was brought down from the quarry by a means of a tramway. It then was brought to Woodlands Terrace where it was unloaded and transferred onto the stone trains.
Regular passenger services from the station only lasted 28 years, as the LMS withdrew them (on grounds of low usage) on 22 September 1930. Excursion traffic continued for more than 30 years thereafter though, as did general goods and stone traffic from the nearby quarry. The ending of the latter in the early sixties eventually led to the closure of the station and northern end of the branch to all traffic on 11 August 1969.

The Site Today

The track was lifted on the final section north of Swinden Quarry in 1971 and the old station buildings were demolished soon afterwards. A housing estate now occupies the site.

Embsay Junction

Embsay Junction was laid at the opening of the line in 1902 to take trains from Skipton to Rylstone Station and Threshfield station. The branch was single throughout.

The other direction was the Skipton to Ilkley Line across the Dales, with stations at Embsay, Bolton Abbey, Addingham and finally ending up at Ilkley. The line was double-tracked, as it formed a useful relief route for the busy main line via Keighley. The Ilkley line was closed in 1966, but the signal box at the junction remained in use until July 1969 (to give access for track-lifting trains and to the quarry siding at Embsay). The remaining double track portion down to Skipton was singled at the same time.

References

Grassington & Threshfield railway station Wikipedia


Similar Topics