Eastside Rail Corridor

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Length
  
15.6 mi (25.1 km)

Use
  
Hiking/Biking

Eastside Rail Corridor httpsuploadwikimediaorgwikipediacommonsthu

Location
  
Eastside King County, Washington, USA

Trailheads
  
Renton (southern terminus) Brightwater plant near Woodinville (northern terminus)

Highest point
  
200 ft (61 m), Kirkland near Peter Kirk Elem.

Lowest point
  
20 ft (6.1 m), Lake Washington shoreline

Eastside rail corridor


The Eastside Rail Corridor is a rail trail under development in the Eastside suburbs of Seattle, Washington. The corridor follows the path of the former Woodinville Subdivision from Renton to the Brightwater sewage treatment plant in unincorporated Snohomish County near Woodinville and Bothell.

Contents

New trail master plan for the eastside rail corridor


Acquisition

The Port of Seattle acquired the right of way of the former Woodinville Subdivision from BNSF Railway through purchase and donation in 2008. On December 10, 2012 the King County Council approved purchase of 15.6 miles (25.1 km) of the right-of-way from Port of Seattle. A portion of the central corridor, named the Cross Kirkland Corridor, is owned by the City of Kirkland; a spur to Redmond, named the Redmond Central Connector, is owned by the City of Redmond; a portion in downtown Bellevue was purchased by Sound Transit, and a northern portion of the corridor remains Port property for dual use as a trail and freight line. Some state residents brought suit against the Port of Seattle because the purchase was not used for freight in its entirety.

Opening

In January, 2015, the 5.75-mile (9.25 km) Kirkland portion of the Eastside Rail Corridor, with compacted gravel surfacing, opened for pedestrians and bicyclists.

Cities and connections

Cities through which the corridor passes include:

  • Renton
  • Newcastle
  • Bellevue
  • Kirkland (Cross Kirkland Corridor)
  • Redmond (planned Redmond Central Connector)
  • Woodinville
  • Trail connections

    If constructed as proposed by King County, these other trails would or could link to the Eastside Rail Corridor:

  • Burke-Gilman Trail / Sammamish River Trail
  • East Lake Sammamish Trail
  • Cedar River Trail
  • Soos Creek Trail
  • Snoqualmie Valley Trail
  • Green River Trail
  • Interurban Trail
  • Snohomish County Centennial Trail
  • Lake-to-Lake Trail (Bellevue)
  • Lake-to-Sound Trail (Renton to Des Moines)
  • Mountains to Sound Greenway Trail (I-90)
  • State Route 520 Trail
  • Tolt Pipeline Trail
  • Ballard Terminal Railroad injunction

    A short line terminal railroad operating in Seattle, the Ballard Terminal Railroad, filed suit in the US District Court for the Western District of Washington and petitioned the Surface Transportation Board on April 1, 2013 seeking to prevent the city of Kirkland from removing the rail tracks for the planned trail. The Ballard Terminal Railroad says they want to keep the tracks intact for future rail freight use. On May 3, 2013 Federal District Court Judge Marsha Pechman granted the City of Kirkland’s motion to dismiss the case filed by Ballard Terminal Railroad Company seeking to prevent rail salvage on the Cross Kirkland Corridor. In her oral ruling, Judge Pechman stated the Federal District Court did not have jurisdiction to consider Ballard’s temporary restraining order (TRO) and that the Surface Transportation Board was the proper forum for adjudicating Ballard’s claims. On Aug. 1 2013 the Surface Transportation Board denied the request by Ballard Terminal Railroad Company to block rail removal along the Cross Kirkland Corridor

    References

    Eastside Rail Corridor Wikipedia