Dates of operation
  
1839–1862

Successor
  
Great Eastern Railway

Eastern Counties Railway wwwcurcorgukcurccoreeagle3gif

Locale
  
East Anglia/East London

Track gauge
  
4 ft 8 ⁄2 in (1,435 mm) (1844-1862)

Previous gauge
  
5 ft (1,524 mm) (1839-44)

The Eastern Counties Railway (ECR) was an English railway company incorporated in 1836 intended to link London with Ipswich via Colchester, and then extend to Norwich and Yarmouth.

Contents

Construction began in 1837 on the first nine miles at the London end. Construction was beset by engineering and other problems, leading to severe financial difficulties. As a result, the project was truncated at Colchester in 1843 but through a series of acquisitions (including the Eastern Union Railway who completed the link between Colchester and Norwich) and opening of other lines, the ECR became the largest of the East Anglian railways.

In 1862 ECR was merged with a number of other companies to form the Great Eastern Railway.

Opening

In 1835 a surveyor called Henry Sayer presented a plan for a new railway from London to York via Cambridge to London solicitors Dimes & Boyman. Together with John Clinton Robertson who was to become the first secretary of the ECR and engineers John Braithwaite it was concluded that this scheme was too optimistic and a scheme from London to Norwich via Colchester and Ipswich would be more viable.

A tour of the key towns on the route followed where considerable opposition from landowners, from sections of the press and members of the public was encountered. Despite this the prospectus of the Grand Eastern Counties Railway was first prepared in 1834 by John Braithwaite. The bill was introduced into the House of Commons on 19 February 1836, and after a stormy passage (two rival schemes had also surfaced in the interim as well as continuing opposition from land owners), it was authorised by an Act of Parliament on 4 July 1836.

Construction of the line began in late March 1837 and progress east of Stratford was relatively easy as the land was largely arable. Indeed, a good number of windmills had to be demolished in order to get the railway built. West of Stratford the line had to cross the unstable Bow Marshes and after that the built up nature of the area meant that the railway had to be built on expensive viaducts.

The two-track railway opened on 20 June 1839 from a temporary terminus at Devonshire Street in Mile End, east London, as far as Romford in Essex. On opening day, two trains topped and tailed by locomotives proceeded along the line watched by crowds of people. Guests of the company enjoyed a sumptuous banquet at Romford enlivened by the sound of cannon and the band of the Coldstream Guards. The strain of building the initial line and continuing disputes with land owners continued to take its toll on the company's finances. ECR backers in Norfolk and Suffolk were demanding work start in their area and the company was forced to go to parliament to increase its capital although this move was rejected. Later in 1839 shareholders made a call for £3 per share should be made (in effect an additional payment by them) although this was reduced to £2 per share in January 1840 which released enough money for the ECR to continue construction.

On 1 July 1840 the ECR opened an extension at the London end to its permanent terminus at Shoreditch (renamed Bishopsgate in 1846) and at the country end to Brentwood. The line between Stratford and Shoreditch was, from 15 September 1840, used by trains of the Northern and Eastern Railway whose line to Broxbourne opened although at first the N&ER trains were not permitted to call at Stratford.

By 1840 it was clear that additional money would be required to complete the ECR line to Colchester. This stretch included 64 bridges or viaducts in addition to numerous culverts, embankments and cuttings. A successful application for more capital was made to parliament and work continued. The winter of 1841 proved very wet and delayed work even further.

Finally on 25 February 1843 a special inspection train left Shoreditch for Colchester. However, the train was stopped at Brentwood as a timber viaduct at Mountnessing had subsided and it was unsafe to continue. On 7 March 1843 goods trains started operation followed by the commencement of passenger services on 29 March.

The costs were as follows:

The line ran to Colchester, a distance of 51 miles to Shoreditch station; the route is now part of the Great Eastern Main Line.

Development

In 1843 the ECR directors were approached with a proposal to build a line from Stratford to the River Thames with the intention of sending out agricultural produce by rail with coal forming the bulk of the traffic the other way. A bill became before parliament sponsored by the Eastern Counties, Stratford & Thames Junction Railway Company and it was the ECR that built the line through to North Woolwich opening on 14 June 1847.

As mentioned above the N&ER had built a line from Stratford – Broxbourne and shared the ECR Shoreditch terminus. This railway had extended to Bishops Stortford in 1842 and Hertford East in 1843 and was in the process of extending its line towards Cambridge. Following on from negotiations in 1843, the ECR took over operation of the N&ER from 1 January 1844 paying rent and dividing the profits until this railway was finally acquired by the Great Eastern Railway in 1902.

Following acquisition of the N&ER the ECR concentrated on building the line towards Newport (Essex) and on 4 June 1844, parliament passed an act authorising the ECR to extend to Cambridge and Brandon in Norfolk where an end on connection with the Norfolk Railway would offer a through route to Norwich. This route opened on 29 July 1845.

In 1845 the ECR was surveying towards Ardleigh with the intention of extending to Harwich although this scheme failed to get parliamentary backing.

Late in 1845 George Hudson was invited by the ECR shareholders to become chairman and an upswing in the lines finances resulted. Hudson then proposed various schemes designed to take the ECR towards York and Lincoln joining up with his North Midland Railway at South Milford. One scheme that came to fruition was the line from Peterborough via March to Ely which opened on 14 January 1847. Increasing passenger numbers at Bishopsgate (renamed from Shoreditch in 1846) saw that station extended in the same year.

It is worth noting that the refusal of the ECR to extend northwards towards Ipswich, led to the formation of the Eastern Union Railway who opened their line between Colchester and Ipswich in 1846.

Other ECR openings in 1847 included to Wisbech East on 3 May and on 17 August, Cambridge to St Ives where a junction with the East Anglian Railway's (EAR) St Ives to Huntingdon line was created. In fact the ECR operated the St Ives to Huntingdon line on behalf of the EAR, but it proved so unprofitable that they threatened to withdraw from the arrangement in October 1849. In the end operation by the ECR restarted with them paying the EAR 25 shillings per day to do so.

The financial depression of 1847/1848 saw the ECR reign back some of its ambitions although the loop line from St Ives to March was opened on 1 February 1848 and the ECR took over the working of the Norfolk Railway on 2 May which extended the ECR empire to Fakenham, Lowestoft and Great Yarmouth. Construction also started on a branch to Maldon East in March 1847 and the first goods trains ran in August 1848 followed by the opening to passenger trains on 2 October of the same year.

By 1849 things were starting to go wrong for the ECR chairman George Hudson and following his non-attendance at the AGM the shareholders, who had received a very small dividend, set up a committee to look into his financial management of the company.

A short branch to Enfield was opened on March 1, 1849. This linked to the current Angel Road station (then called Edmonton). Later the same month the Dereham to Fakenham line, the building of which had been started by the Norfolk Railway, was opened by the ECR on 20 March 1849.

The ECR did not enjoy good relations with the London & Blackwall Railway. They had built the London & Blackwall Extension Railway from Stepney East which was supposed to have a junction with the ECR at Bow Junction. This was not connected and an ill-served interchange station called Victoria Park & Bow lasted until 1850. Both the L&BR and the ECR had been promoting railways to Tilbury and it was in September 1851 that the L&BR directors asked George Parker Bidder to approach the ECR with regard to a joint bill.

There were no additions to the ECR network in 1850 and in 1851 a short branch from what is now Shepreth Branch Junction near Shelford to Shepreth was built. Back in 1848 a parliamentary act was granted to the Royston and Hitchin Railway to extend their line from Royston. Although Cambridge was its goal, Parliament sanctioned only an extension as far as Shepreth (as the Eastern Counties Railway had opposed the extension to Cambridge). The line was completed in 1851 and initially the GNR, who had leased the Royston and Hitchin Railway in the interim, ran a connecting horse-drawn omnibus service. This proved unsuccessful so the new line and the line to Hitchin were leased to the Eastern Counties Railway for 14 years, with a connection at Shepreth to enable the ECR to run trains from Cambridge to Hitchin.

In 1852 the ECR took over operation of the East Anglian Railway. The company's property had been taken over by the receiver in June 1850 and the EAR was leased to the Great Northern Railway (GNR). The GNR had running powers over the ECR line between Peterborough, March and Wisbech (opened 1847). Unfortunately, they had not applied for running rights over the line that linked the ECR and EAR stations at Wisbech and the ECR refused access so that the passengers had to change stations by horse-bus. However, shareholder opposition within the GNR and EAR were the real reason why the GNR withdrew from the arrangement allowing the ECR to take over operation of the EAR.

In 1853 the Eastern Union Railway was in serious financial trouble having built lines to Norwich, Bury St Edmunds (as the Ipswich and Bury Railway), Sudbury and had a branch to Harwich under construction. Negotiations began between the EUR and ECR and on 1 January 1854 the ECR took over working of the EUR although this was not formally ratified until the Parliamentary Act of 7 August 1854. The two companies did not formally merge until they amalgamated with other railways to form the Great Eastern Railway in 1862.

The Harwich branch whilst built by the EUR was opened by the ECR, the following week on 15 August.

The ECR also took over the Newmarket Railway in 1854 which linked Cambridge with Ipswich Bury St Edmunds.

In 1854 the ECR/L&BR owned London Tilbury and Southend Railway started operating over the Forest Gate Junction to Bow Junction and onto Fenchurch Street. Early trains split at Stratford with a portion of the train to Bishopsgate station. A third line between Stratford and Bow Junction was built to help accommodate this traffic and ECR services had running rights into Fenchurch Street via the London and Blackwall Railway extension route.

A line was also provided linking Victoria Park station on the North London Railway(NLR) with Stratford low level and Stratford Market stations which was primarily for goods traffic. The Loughton branch of the ECR was opened on August 22, 1856 with a junction just north of Stratford on the Cambridge line.

In 1859 the East Suffolk Railway finished building a series of lines in Suffolk and south east Norfolk. These were all taken over by the ECR on opening day 1 June 1859. The ECR line from Ipswich (East Suffolk Junction) to Woodbridge (at the south end of the ESR) also opened on this day giving a through route between Ipswich, Lowestoft and Great Yarmouth (South Town).

The final railway opened by the ECR before the incorporation of the GER in 1862 took place on 12 April 1860 when the Leiston branch in East Suffolk was extended to Aldeburgh.

Accidents and incidents

  • In September 1840, a train was in a rear-end collision with a passenger train at Old Ford, Essex. One person was killed.
  • In November 1846, an Inquest was held at the New Inn, Roydon, yesterday week, on the body of Elizabeth Coleman, aged eleven years, who was killed upon the above line. The deceased was, it appeared, endeavouring to cross the line at a point near the Roydon station where the Lockroad crosses the line on a level, when she was struck by the buffer of a Cambridge train, and killed upon the spot. The jury returned a verdict of "Accidental death". The inquest would have taken place on Wednesday, November 25, 1846
  • In September 1853, a freight train came to a halt near Brandon, Suffolk, due to a defect on the locomotive. The driver of a second freight train ignored a red signal and consequently his train was in a rear-end collision with the first. Time interval working was in force.
  • On 20 February 1860, a passenger train derailed at Tottenham when a tyre broke on the locomotive hauling it. Seven people were killed.
  • Engine Sheds and works

    The first engine shed was located at Whalebone Lane, Chadwell Heath opening in 1839 with the railway. Following the extension of the ECR to Brentwood in 1840, a "railway factory" at Romford (between the current stations of Chadwell Heath and Gidea Park (on the east side of the line) was built being fully operational by 1842. The most significant task the factory undertook was the gauge conversion of the ECR stock in 1844.

    As the ECR grew it became apparent that a new site would be needed and land was acquired at Stratford between the ECR Colchester line and the N&ER line to Cambridge. The N&ER had already established an engine shed at this location when their line to Broxbourne had opened in 1840.

    At this stage Stratford was a largely rural location with plenty of land being available and in connection with this move the ECR built 300 new houses for the work force.

    Stratford engine shed and Stratford Works initially shared this site and it was not until the 1860s that the GER moved the engine sheds to the other side of the Cambridge line.

    Various other engine sheds grew up around the expanding ECR network either being constructed by the ECR or the railways it took over; for example Ipswich engine shed which was built by the Eastern Union Railway.

    Early Eastern Counties locomotives

    In order to build the line, the ECR purchased four 0-4-0 Ballast locomotives delivered in late 1838 and named Suffolk, Norfolk, Essex and Middlesex. These and the next six engines ordered were built by Braithwaite, Milner and Co. Six 2-2-0 locomotives (original numbers 1-6) were the first ECR passenger engines and had a poor reputation with regard to derailments. Braithwaite, Milner and Co supplied another similar locomotive in 1839 which was number 7. Two 0-4-0 goods engines (8 and 9) were also ordered from Braithwaite, Milner and Co in 1840 lasting until 1849 when they were sold.

    In 1841 Lancashire firm Jones, Turner and Evans supplied four 2-2-0 locomotives (Nos 12-15) which lasted until 1850. Later the same year Burys supplied two 0-4-2 passenger locomotives (Nos 10 and 11) to the ECR.

    Numbers 16 and 17 were 2-2-0 passenger singles ordered from Bury and Co and were in service in early 1842. Later in 1842 The ECR board ordered eight more Bury singles (numbers 18-26). Some of these engines survived until 1859/60. These were all the locomotives purchased before the acquisition of the Northern and Eastern Railway in 1844 and the gauge conversion of late 1844 when many of these engines were converted to UK standard gauge at the Romford factory.

    Locomotive Fleet as at 1856

    As described above, the ECR grew up in piecemeal fashion at times ordering its own locomotives, and then acquiring other companies locomotives when the firms were taken over. This makes the history quite complex and the table below is an overview of the company's locomotives in 1856.

    Robert Sinclair

    After Gooch’s departure Robert Sinclair took over as Locomotive Superintendent. In 1858 he designed a small class of 2-4-0 (known as Z class) built by Rothwell and Co. These were locos numbered 301-306.

    As can be seen from the table above he inherited a mixed bag of locomotives and set out on a road of standardisation. Perhaps the best example of this was his Y class 2-4-0 introduced in 1859 which when building finished (in Great Eastern days and after Sinclair had departed the company) numbered 110 locomotives. Although the general design was the same the locomotives were built by a number of different companies including Kitsons, Vulcan and in 1865 (in GER days) the French railway firm Schneider at cie.

    The ECR sent the first Y class no 327 (an example built by Stephenson) to the 1862 International Exhibition where it caught the eye of the Egyptian government who ordered 11 similar locomotives.

    Sinclair’s only other design (for the ECR) was the five strong X class 2-4-0WT introduced in 1862 and built at Stratford Works. Numbered 120-124 (noting the similarly numbered locomotives in the above table had been renumbered or withdrawn) these were deployed on the line to North Woolwich.

    Carriages

    The 1844 Railway Act laid down standards for third class carriages. Facilities were very spartan with wooden benches seating 46 passengers who could access the three compartments through three doors. The middle compartment seated 18 passengers whilst the end compartments seated 14 each.

    It is known that carriages were built at Stratford Works and Fairfield Works in Bow.

    An ECR first class carriage has survived and is part of the UK national collection.

    Goods traffic

    Goods traffic on the ECR was largely agricultural in nature. The table below shows a breakdown of the traffic carried week ending 6 May 1849.

    Use of steam excavating machine

    Railways in the UK were generally built by pick, shovel and large numbers of railway navvies. Engineer John Braithwaite deployed the first steam excavating machine used on a UK railway at Brentwood (exact date unknown but working in 1843).

    Two wheel pony truck

    The ECR was the first railway company to use a two-wheel pony truck, in 1859, using the design of American inventor Levi Bissell. This innovation was patented in the USA on November 2, 1858 and on 1 December 1858 in Great Britain. In the summer of 1859 the ECR fitted the truck to locomotive 248, a Kitsons built 2-4-0 of 1855, and it was reported that the ride of the locomotive was improved and wheel flange wear noticeably reduced.

    An early steam coach

    In 1849 the ECR introduced a steam rail motor called Enfield which worked on the Enfield Branch Line. This locomotive was a 2-2-0 locomotive and 36 seat four compartment coach on one frame and was built by William Bridges Adams in 1849 at Fairfield Works, Bow. It proved reasonably successful and in fact not long after delivery covered the 126-mile route from Bishopsgate to Norwich (via Cambridge) in a creditable (for the time) 3 hours 35 minutes.

    Enfield was later converted to a 2-2-2T locomotive as the difficulty of a combined locomotive/carriage (presumably too long for early turntables?) became apparent.

    Track gauge

    The ECR's railway was originally 5 ft (1,524 mm) gauge on the recommendation of engineer John Braithwaite: at this time there was no legislation dictating the choice of gauge, and the directors favoured the Great Western Railway's broad gauge of 7 ft (2,134 mm). On grounds of cost Braithwaite recommended the 5 ft gauge to reduce wear on locomotive parts, and the N&ER, planning to use the ECR between Stratford and Bishopsgate, was forced to adopt the same gauge.

    With the extension of the railway in the early 1840s it became apparent that 4 ft 8 12 in (1,435 mm) standard gauge was a better choice, and in September and October 1844 gauge conversion was carried out, with the N&ER.

    Railway Organisation (1830/1840s)

    The directors were responsible for appointing staff whilst a finance committee decided the wages. The engineer was responsible for rolling stock and permanent way whilst the traffic manager dealt with operations. Stations were run by a police sergeant who had ticket clerks under them and they reported to a number of inspectors and an overall manager. Other policemen were responsible for the operation of points and signals as well as more familiar duties. Conductors were in charge of trains assisted by guards and a small number of porters.

    Locomotive Superintendents

  • John Hunter 1846-1850
  • John Viret Gooch 1850-1856 was dismissed for financial irregularities (details on that entry).
  • Robert Sinclair 1856 – 1863 was the first Locomotive Superintendent of the Great Eastern Railway.
  • Chairmen

  • William Tite the architect, was the first chairman.
  • 1836-1845 Henry Bosanquet – a director of the Westminster Bank
  • 1845-1849 George Hudson
  • Hudson was appointed chairman of the ailing Eastern Counties Railway in 1845 and one of his first actions was to appoint David Waddington as his vice chairman. Hudson was interested in the ECR as he felt it offered an opportunity for an alternative route from York to London although the truth was the ECR had an appalling reputation for time keeping and safety at this time; Hudson immediately ordered the payment of a generous dividend for the shareholders. Later investigation showed that whilst Hudson decided the levels of dividends to be paid to shareholders it was Waddington's job to doctor the traffic accounts to make it appear legally earned. Waddington also siphoned off £8,000 of the ECR's money into a parliamentary slush fund which strained relations between Hudson and Waddington. Hudson cut costs in a similar way on the North Midland Railway and an accident at Romford on 18 July 1846 led the satirical magazine Punch to petition Hudson to the effect that: "by reason of the misconduct, negligence and insobriety of drivers and sundry stokers, engineers, policemen, and others, your Majesty's subjects, various and several collisions, explosions and oversettings are continually taking place on the railways, your Majesty's dominion".
  • 1849 -1850 Edward Ladd Betts – rail contractor and business partner of Samuel Morton Peto.
  • 1851-1856 David Waddington (Essex) – Waddington had been vice-chairman under the Hudson regime and was dismissed after investigation of financial irregularities along with Gooch.
  • 1856-1862 Horatio Love – Love was the first chairman of the Great Eastern Railway between 1862 and 1863.
  • Woolwich Ferry

    Following the opening of the line to North Woolwich the ECR ordered two ferries called Essex and Kent from Blyth & Co of Barking. The two wooden paddle steamers weighed 65 tons (gross), 78.5 feet long, 14.9 beam and 7.3 feet depth. The cost for each boat was £3,250.

    In June – August 1854 113,315 passengers used the ferry whilst a year later this had risen to 141,025. In 1856 the two ferries were overhauled at Blyth & Co and continued in use on the ferry for a number of years after the 1862 merger with the Great Eastern.

    Merger into the Great Eastern Railway

    In 1862 the merged company amalgamated with other East Anglian railways to form the Great Eastern Railway.

    References

    Eastern Counties Railway Wikipedia