Neha Patil (Editor)

East River Tunnels

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Constructed
  
1904-1909

Character
  
Passenger

Length
  
1,204 m

Width
  
7.01 m

Traffic
  
Rail

Design engineer
  
Alfred Noble

Opened
  
8 September 1910

Owner
  
East River Tunnels Amtrak East River tunnel repairs maintenance procedures to change

Location
  
Similar
  
Hell Gate Bridge, Queens–Midtown Tunnel, 63rd Street Tunnel, Atlantic Terminal, Steinway Tunnel

Entering the east river tunnels


The East River Tunnels are 4 single-track railroad tunnels that extend from the eastern end of Pennsylvania Station under 32nd and 33rd Streets in Manhattan and cross the East River to Long Island City in Queens. The tracks carry Long Island Rail Road (LIRR) and Amtrak trains travelling to and from Penn Station and points to the north and east. The tracks also carry New Jersey Transit trains deadheading to Sunnyside Yard. They are part of Amtrak's Northeast Corridor, so trains traveling between New York City and New England use the tunnels on their way to and from the Hell Gate Bridge.

Contents

East River Tunnels Tunnel Under the East River

History

East River Tunnels Schumer Sandydamaged East River tunnels to get 432M repair Newsday

The tunnels were built in the first decade of the 20th century as part of the Pennsylvania Tunnel and Terminal Railroad, providing a connection between the Pennsylvania Railroad's train station in New York City, Pennsylvania Station, and the railroad's Sunnyside Yard. The tunnels opened in 1910. At that time the LIRR was a subsidiary of the Pennsylvania Railroad, and the tunnels allowed the LIRR its first of two direct accesses to Manhattan, the future East Side Access being the second.

East River Tunnels httpsuploadwikimediaorgwikipediacommonsthu

The construction contract was awarded to S. Pearson and Son. The project was led by Chief Engineer Alfred Noble. Work began in 1904 and was completed by 1909. The four tunnels were built simultaneously, digging east from Penn Station, west from Long Island City, and east and west from shafts just east of First Avenue; they opened along with Pennsylvania Station in 1910. (Until 1910, LIRR trains ran to Long Island City, where passengers took ferries across the East River to the 34th Street Ferry Terminal in Manhattan.)

Operation

East River Tunnels Amtrak East River Tunnels New York City New York

The East River Tunnels are currently owned by Amtrak and are electrified by both third rail and overhead catenary. Diesel-powered locomotives are not allowed in the tunnels except in emergency because of ventilation concerns, so the LIRR uses DM30AC dual-mode locomotives to power a few trains from non-electrified lines into and out of Penn Station during rush hours.

The four lines under the river are numbered south to north, Lines 1 and 2 running beneath 32nd St and Lines 3 and 4 under 33rd St. Eastward trains tend to use Lines 1 and 3, so to bring the two eastward lines together. Line 3 crosses beneath Line 2 underground a few hundred feet west of the east end of the Line 2 tunnel.


  • East portals for Lines 1 and 3: 40.7429°N 73.9450°W / 40.7429; -73.9450
  • East portal for Line 2: 40.7421°N 73.9483°W / 40.7421; -73.9483
  • East portal for Line 4: 40.74305°N 73.94585°W / 40.74305; -73.94585
  • Approaching Harold Interlocking from the west, the four tracks are Lines 1-3-2-4 south to north (with three LIRR tracks between Lines 2 and 3, and Sunnyside Yard approach tracks here and there). East of Harold, Lines 1-3 become LIRR Main Line Tracks 4-2 south to north, while Lines 2-4 become LIRR Main Line Track 3 and the westward Port Washington main. (Harold was rearranged in 1990; until then Lines 2-4 became the westward Port Washington and the westward Hell Gate track).

    References

    East River Tunnels Wikipedia