Dry Lake Wind Power Project

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Operating

Nameplate capacity
  
Phase 1: 63 MW

Address
  
Arizona, USA

Owner
  
Iberdrola Renovables

Commission date
  
October 2009

Annual gross output
  
127MW

Phone
  
+1 503-796-7000

Dry Lake Wind Power Project

Location
  
between Holbrook and Heber, Arizona

Units operational
  
Phase 1: 30 Suzlon wind turbines, @2.1 MW

Dry Lake Wind Power Project in Navajo County is Arizona's first utility-scale wind farm. Phase 1 consists of 30 Suzlon 2.1 MW wind turbines, for a total nameplate capacity of 63 MW. Iberdrola Renewables built the wind farm for $100 million, and sells the output to Salt River Project. Based on wind measurements before construction began, Iberdrola estimates phase 1 will produce an average of 132,450 MWh annually. This implies a capacity factor of:

Contents

132 , 450  MWh ( 8760  h/yr ) × ( 63  MW ) 24 %

HistoryEdit

Around 2003, rancher Bill Elkins began working with developer John Gaglioti and Northern Arizona University scientists to erect measurement towers on his land to measure wind speeds. He studied the local power grid to determine the feasibility of connecting a wind farm. Navajo County and Iberdrola officials credit Gaglioti and Elkins with attracting the first wind farm to Arizona.

Future developmentEdit

As of 2009, Iberdrola planned to install 209 more turbines in future construction phases.

Phase 2 will consist of up to 31 Suzlon wind turbines for a combined nameplate capacity of 65 MW. The location of phase 2 (34.60°N 110.16°W / 34.60; -110.16 (Dry Lake Wind Power Project phase II)) will be about seven miles (11 km) northwest of Snowflake and three miles (5 km) east of phase 1.

Environmental effectEdit

According to the USDOE, each 1000 MW of wind power capacity installed in Arizona will save 818 million US gallons (3,100,000 m3) of water per year and eliminate 2.0 million tons of carbon dioxide emissions. Phase 1 of Dry Lake Wind Power Project would then eliminate:

2 , 000 , 000  tons × 63  MW 1000  MW = 126 , 000  tons

of carbon dioxide, and save:

818 , 000 , 000  gallons × 63  MW 1000  MW = 51 , 534 , 000  gallons

of water annually.