Existed: 1997 – present Length 40 km | South end: Serdang Interchange Constructed 1997 | |
History: Completed in December 1998 and opened to public in January 1999. North end: Sri Damansara Interchange Primarydestinations: Bukit Lanjan, Damansara Perdana, Mutiara Damansara, Bandar Utama, Taman Tun Dr Ismail, Kelana Jaya, Bandar Sunway, Subang Jaya, Petaling Jaya, Puchong, USJ, Sungai Besi, Shah Alam, Putrajaya, Cyberjaya |
The Damansara–Puchong Expressway or Lebuhraya Damansara-Puchong (LDP) E11, is a major expressway in Klang Valley, Selangor in Malaysia. It links major townships in Damansara and Puchong and decreases travel time between them. Besides that, the 40 km (25 mi) expressway provides better accessibility to these areas via links to other expressways in Klang Valley, such as Federal Highway 2, Puchong-Sungai Besi Highway 217, New Pantai Expressway (NPE) E10, Sprint Expressway E23, Sungai Buloh Highway 54, and Kuala Lumpur Middle Ring Road 2 (MRR2) Route 28. This expressway is part of the Kuala Lumpur Middle Ring Road 2 Scheme.
Contents
- Map of LDP Malaysia
- Route background
- History
- Pioneer routes
- Puchong Jaya Interchange
- Kelana Jaya and Kampung Baru Puchong interchanges
- TTDI Interchange
- Features
- Notable events
- Tolls
- Electronic Toll Collections ETC
- Toll rates
- List of interchanges and laybys
- References
Map of LDP, Malaysia
Route background
The Kilometre Zero of the Damansara–Puchong Expressway is located at Sri Damansara Interchange, where it connects with the Federal Route 54 and Kuala Lumpur Middle Ring Road 2, Federal Route 28.
History
The construction of the Damansara–Puchong Expressway was awarded to Lingkaran Trans Kota Holdings Bhd (Litrak). On 23 April 1996, the Concession Agreement was signed between the Government of Malaysia and Litrak for the privatisation of the improvement, upgrading, design, construction, maintenance, operations and management of Damansara–Puchong Expressway.
Construction of the expressway began on September 1996 and completed on December 1998. The work was awarded on a turnkey basis (i.e. design and construct) to Gamuda–Irama Duta Joint Venture (GIDJV) at a cost of RM 1.1 billion. The overall cost for expressway is RM 1.4 billon. The expressway was opened to traffic on 25 January 1999.
With the completion of the Damansara–Puchong Expressway, the Kuala Lumpur Middle Ring Road 2 (MRR2) is substantially completed on the west of Kuala Lumpur which provides for free flow and ease congestion. It also links Bandar Sunway to Puchong, which has been long-awaited, and traveling time is shortened between Petaling Jaya and Puchong. The expressways connects the Putrajaya and Hicom/Shah Alam with MRR2.
The expressway used to have its own electronic toll collection system known as the "FasTrak". From 1 July 2004, the FasTrak was replaced by the Touch 'n Go and SmartTAG systems.
Pioneer routes
The construction of the Damansara–Puchong Expressway includes the acquisition and upgrades of several major roads as follows:-
Puchong Jaya Interchange
The upgrading works of the Puchong Jaya Interchange including ramp from Bukit Jalil Highway to the expressway began in 2002 and were completed in 2005.
Kelana Jaya and Kampung Baru Puchong interchanges
The Kelana Jaya Interchange which used to be a U-turn junction was completed in 2007.
The Kampung Baru Puchong Interchange was upgraded from underpass to diamond interchange was completed in 2007.
TTDI Interchange
The TTDI Interchange upgrading project is being undertaken by Lingkaran Trans Kota Holdings Bhd (Litrak) to improve the level of service on LDP.
The project which commenced in August 2007 with a total budget of RM133 million involves widening of certain stretches and building a flyover and an underpass at TTDI Interchange.
The congestion at the interchange is mainly due to multiple weaving of traffic from TTDI to Bandar Utama, TTDI to Damansara Utama and Damansara Utama to TTDI. Once completed, the upgraded interchange will ease traffic flow from TTDI to Bandar Utama/Kepong and there will also be smoother flow on the LDP mainline to Bandar Utama and Kepong.
The upgraded interchange will also allow more green time for localized traffic movement.
The project work involves the following:
The project is scheduled for full completion in May 2011 with the flyover expected to be opened earlier upon its completion.
Features
Notable events
Tolls
The Damansara–Puchong Expressway uses opened toll systems.
Electronic Toll Collections (ETC)
As part of an initiative to facilitate faster transactions at the Penchala, PJS, Puchong West and Puchong South Toll Plazas, all toll transactions at four toll plazas on the Damansara–Puchong Expressway has now conducted electronically via Touch 'n Go cards or SmartTAGs starting 9 November 2016.
Toll rates
(Source: http://www.litrak.com.my/?page_id=61)List of interchanges and laybys
Below is a list of interchange of the Damansara Puchong Expressway (LDP):