Dagenham wind turbines

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
England

Commission date
  
2004

Nameplate capacity
  
5.9 MW

Location
  
Dagenham, London

Units operational
  
3 Enercon turbines

Owner
  
Ford Motor Company

Dagenham wind turbines httpsuploadwikimediaorgwikipediacommonsthu

Dagenham wind turbines


The Dagenham wind turbines are two 85 m high Enercon E-66 and one E-82 wind turbines located on the Dagenham estate of the Ford Motor Company in East London, England. The first two turbines were completed in April 2004 and the third was installed in 2011. They are landmarks of the skyline and the first 'wind farm' to be built in London.

Contents

Planning and building

One turbine is located in the London Borough of Barking and Dagenham, (Turbine 1) the second in the Hornchurch Marshes area of the London Borough of Havering (Turbine 2). Planning consent was received from both boroughs. The Mayor of London gave approval for the project in August 2003.

The turbines were constructed by the green energy company Ecotricity. Planning consent was also given for a third 65 m high turbine (Turbine 3) in Havering, with a viewing platform which was not constructed. The planned operating date for the third wind turbine was by the first quarter of 2009, and it was eventually installed in 2011.

Specifications

The turbines are located 10 miles (16 km) east of the City of London at OS grid reference TQ492824 and TQ502818. They are 85 m high to the hub, have a rotor diameter of 70 m and a combined capacity of 5.9 MW. The total height to the top of the rotors is 120 m.