Supriya Ghosh (Editor)

Chixoy Hydroelectric Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Opening date
  
1983

Length
  
250 m

Opened
  
1983

Phone
  
+502 4640 1131

Construction began
  
1976

Operator(s)
  
EGEE - INDE

Address
  
Height
  
90 m

Construction cost
  
944 million USD

Impound
  
Chixoy Hydroelectric Dam

Official name
  
Planta Hidroeléctrica Chixoy

Location
  
Impounds
  
Chixoy River (Río Negro)

Similar
  
Xacbal Dam, Semuc Champey, Biotopo del Quetzal, Parque Acuático Agua Bla, Castillo de San Felipe de Lara

The Chixoy Dam (Spanish: Planta Hidroeléctrica Chixoy) is a reinforced concrete dam and power plant spanning the Chixoy River between the Departments of Baja Verapaz, El Quiché and Alta Verapaz, Guatemala. It is the largest structure of its kind in the country.

Contents

It was built between 1976 and 1985 and it generates approximately 15% of the country's power.

The dam's construction was very controversial and displaced many indigenous Maya Achi peoples. Government forced relocations resulted in the Río Negro massacres which claimed up to 5,000 lives between 1980 and 1982.

HistoryEdit

Construction on the dam started in 1976, with funding from the World Bank and the Inter-American Development Bank. Major redesign work was needed to address adjusted seismic criteria for the dam and tunnelling works, following the heavy 1976 earthquake. Additional costs were made to correct engineering errors, and to finance repairs to tunnel damage in the first year of operation, resulting in substantial over-budgeting. From the US$372.7 million calculated costs in 1978, the Chixoy project ended up costing US$944 million.

The construction of the dam, and its reservoir, displaced several local communities with a total population of 3,445 people. Community resettlement efforts were poorly handled by the consecutive military governments at the time. Subsequent popular protests and claims were met with extremely brutal repression by government forces, and culminated in what is known as the Río Negro Massacres. Claims have not yet been settled 25 years after the hydro-electric plant went into operation.

Power plantEdit

The hydroelectricity plant has 5 x 60 MWe pelton turbines with an effective capacity of 275 MWe, which is approximately 15% of Guatemala's total electricity production (2006) and 60% of INDE's electricity production. A 26 km long tunneling system with an elevation difference of 433 m, feeds the water to the plant's turbines.