Kalpana Kalpana (Editor)

Changi Airport Skytrain

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Stations
  
7

Opened
  
1990

Status
  
Operational

Services
  
5

Track gauge
  
Broad gauge


Locale
  
Singapore Changi Airport serving Singapore

Owner
  
Civil Aviation Authority of Singapore

Changi airport skytrain last train


The Changi Airport Skytrain is an automated people mover that connects Terminals 1, 2 and 3 at Singapore Changi Airport. Opened in 1990, it was the first driverless and automated system in Asia. The Changi Airport Skytrain operates from 0500 to 0230 daily and operates at 1 to 2-minute intervals. Travel on the Skytrain is free and an inter-terminal journey takes about 90 seconds. All stations have platform screen doors, are air conditioned and have plasma displays indicating the arrival time of the next train.

Contents

Changi Airport Skytrain uploadwikimediaorgwikipediaenthumb779Chang

With the opening of the Changi Airport MRT Station on 8 February 2002, the Skytrain is able to connect passengers at Terminal 1 to the MRT station entrances located at Terminals 2 and 3.

Changi Airport Skytrain Mitsubishi Crystal Mover Changi Airport Skytrain SGTrainscom

Mitsubishi crystal mover changi airport skytrain departing terminal 2 secure area


Rolling Stock

Trains operating on the Changi Airport Skytrain is the Mitsubishi Crystal Mover manufactured by MHI.

Changi Airport Skytrain Changi Airport Transit Shuttle Skytrain Set 12 from Terminal 3 to

Initially, the Skytrain rolling stock consisted of Adtranz C-100s, jointly built by Westinghouse and Adtranz (acquired by Bombardier). In 2002, work began on a new S$135 million Mitsubishi Crystal Mover-based system to accommodate the planned opening of Changi Airport Terminal 3 and the projected increase in demand as the airport expands.

Changi Airport Skytrain FileChangi Airport Skytrain Crystal Mover entering terminal 3jpg

The previous rolling stock of Adtranz C-100 ran without a second carriage per train (as opposed to the current Mitsubishi Crystal Movers, which runs with two carriages per train), and the first two platform screen doors of each station were for emergency purposes (The C-100s stopped at the outer half of each station, with two doors on each half.).

Changi Airport Skytrain Mitsubishi Crystal Mover Changi Airport Skytrain SGTrainscom

The third rail, formerly at the centre of the track, was moved to the side. The new system opened in March 2006 between Terminals 1 and 2 and opened the connection with Terminal 3 in November 2007 during Terminal 3's open house.

When it is Crystal Mover train like today, the Platform screen doors have glass windows to let to know when the train comes compared to the past which is small window or no glass window like Elevator Windows which is similar to Miami Airport Skytrain Concourse E.

Mitsubishi Heavy Industries Crystal Mover

As of 2016 the Changi Airport Skytrain uses the Mitsubishi Heavy Industries Crystal Mover automated people mover. This rolling stock entered service in 2006 and replaced the 16-year-old Adtranz C-100, bringing this rolling stock of the second generation APM in Changi Airport.

Exterior design

The design of the train was black on top with grey on the bottom. The headlights were at the side with bigger headlights, compared to the ones operating on Sengkang LRT Line and Punggol LRT Line, the headlights were small and at the bottom of the train. They placed Changi Logo at the side of each trains. They placed the fleet number at the middle part of the train.

Interior design

The color of the interior is light-yellow. LCD screens (?) are placed at the end of every car, similar to the never-used LCD screens on the Mitsubishi Heavy Industries Crystal Mover C810. Unlike trains run under LRT, which have seating in the middle, it does not have seating in the middle and only at the end of each train. This is to allow more standing and more luggage space, also when the train is getting crowded. The trains boarded depends on which area one is in, for example, if you are in the Public Area, the seat color is blue (Set 01–10), while the Transit Area provides an orange color scheme on the seats (Set 11–16).

Train Formation

The configuration of a Mitubishi Crystal Mover in revenue service is M in single car mode and M-M is dual car mode

Redevelopment works

In 2015, a part of the Changi Airport Skytrain system connecting Station B and E will be suspended due to construction works for the upcoming Jewel Changi Airport. Passengers in the public area will have to use the mezzazine level bridge along Changi Airport MRT station, and the skytrain operating between Station A and F in the transit area.

Future expansion

Plans are in place for possible future expansions of the system. To increase the system capacity of the Skytrain, six new train cars have been purchased and will be rolled out to the system by 2019. The existing shuttle between Terminals 2 and 3 will be upgraded to a three-car system, whereas the shuttle between Terminal 3 and 3 South will be upgraded to a two-car system.

References

Changi Airport Skytrain Wikipedia


Similar Topics