Country Wales, United Kingdom Status Operational Hub height 31.5 m (103 ft) Units operational 68 | ||
![]() | ||
Commission date October 1996March 2009 |
Ktm race carno wind farm
Carno is a wind farm of 68 turbines which started operation in October 1996. It covers an area of over 600 hectares on Trannon Moor, a plateau to the west of the village of Carno in Powys, Mid Wales, 400 metres (1,300 ft) above sea level.
Contents
Carno currently has the largest production capacity in Wales.
Originally consisting of 56 wind turbines each of 600 kilowatts (kW) maximum output, the combined maximum power of 33.6 megawatts (MW) made Carno the largest Wind Farm in Europe at the time of its construction. The total project cost was approximately £26 million.
Information:
Public footpaths cross the site and are waymarked on Ordnance Survey maps.
In 2008, an extension designated "Carno 2" was completed, bringing the total number of turbines to 68, comprising 12 new Siemens 1.3MW wind turbines with a hub height of 49 metres (161 ft), blade length of 30 metres (98 ft) and rotor diameter of 62 metres (203 ft) giving a tip height of 80 metres (260 ft).