Capital Wind Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Australia

Construction began
  
Early 2008

Type
  
onshore

Owner
  
Infigen Energy

Units operational
  
67

Status
  
Operating

Operator(s)
  
Infigen Energy

Phone
  
+61 2 8031 9900

Construction cost
  
370 million AUD

Capital Wind Farm

Location
  
30 km (19 mi) north east of Canberra

Address
  
Lake George NSW 2581, Australia

Capital wind farm near lake george canberra


The Capital Wind Farm near Bungendore is the largest wind farm in New South Wales. It is part of the 6,000-hectare (15,000-acre) Capital Renewable Energy Precinct, along with nearby Woodlawn Wind Farm and the Capital East Solar Demonstration Plant.

Contents

Capital Wind Farm was built by international contractors Suzlon Energy for owner and operator Infigen Energy. Construction began in early 2008, and the wind farm became fully operational in October 2009. It is a 140.7 megawatt wind farm with 67 turbines.

Location

The Capital Wind Farm is around 30 kilometres (19 mi) north east of Canberra, just southeast of Lake George and north of Bungendore. It is located in open farming country, with minimal obstructions in the landscape and smooth topography.

Construction

The Capital Wind Farm was built for Infigen Energy by Suzlon Energy. It was constructed as part of the Kurnell Desalination Plant project to offset the power usage of the desalination plant.

"The wind farm has been designed to produce more than enough energy to operate the desalination plant to cover the days when there is less wind. It will increase the supply of wind energy in NSW by over 700%. It is a massive boost to the renewable energy sector and an environmentally sensible way to offset the power needs of the desalination plant." [1]

The wind farm was completed in October 2009 at a cost estimated between A$220 million and A$370 million. It was opened by the Prime Minister at the time, Kevin Rudd, in November 2009.

People and employment

Since the wind farm was established, the population of nearby Bungendore has increased by 24 per cent, which the Clean Energy Council has claimed is because of its proximity to the wind farm.

During construction of the Capital Wind Farm, 120 people were employed on the project. Over the construction period, about A$10 million went into the local economy, with spending up at the local stores, restaurants and motels. Since construction has finished there are 15 ongoing jobs at the wind farm for service and maintenance.

Some residents who live nearby to the Capital Wind Farm have complained about the noise from the turbines.