Rahul Sharma (Editor)

Berkhamsted railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Berkhamsted

Station code
  
BKM

DfT category
  
C2

Opened
  
1875

Local authority
  
Dacorum

Grid reference
  
SP993081

Managed by
  
London Midland

2011/12
  
1.544 million

Number of platforms
  
4

Berkhamsted railway station

Address
  
Berkhamsted HP4 2AJ, United Kingdom

Similar
  
Hemel Hempstead railway st, Tring railway station, Apsley railway station, Cheddington railway station, Kings Langley railway st

Berkhamsted railway station 06 6 2016


Berkhamsted railway station is in the town of Berkhamsted, Hertfordshire, England. It is located just beside Berkhamsted Castle, overlooking the Grand Junction Canal. The station is 28 miles (45 km) north west of London Euston on the West Coast Main Line. London Midland operates services to London, Northampton and many other destinations.

Contents

There are 4 platforms of 12-car length on both the fast and slow lines. The platforms are arranged around a central island and two side platforms. The station is relatively unusual on the route in that most of the original buildings have been retained.

History

The present Berkhamsted station dates from 1875, and is located on the Lower King's road on the junction with Brownlow Road. The original station building, opened in 1838, was located approximately 330 feet (100 m) south-east of the present structure, near the bridge onto Castle Street. It was designed in an Elizabethan style of architecture with a brick gabled booking hall. The building was replaced by a new station with additional sidings in 1875 when the railway was widened, the sidings replacing an earlier goods yard near Gravel Path. In 1887, the fastest train would depart at 08:54 and arrive at London Euston at 09:35, with one stop at Willesden Junction, a 41-minute journey.

During the building of the London and Birmingham Railway (the L&BR, today's West Coast Main Line) in the 1830s, Berkhamsted was for a few years a centre of railway construction. The armies of navvies, bricklayers and miners brought in from the English Midlands, Ireland, London and the North of England led to overcrowding in Berkhamsted and the rowdy behaviour of the labourers was said to have offended the genteel townsfolk. Seven young men aged 18–26 were killed while working on the Berkhamsted section of the railway.

Before construction work on the Berkhamsted section of the L&BR began, the project was subject to public protest. Many landowners and turnpike trustees in Hertfordshire were opposed to the new railway line, and protest meetings were held at the King's Arms Hotel in Berkhamsted. Although local opposition to the iron horse was led by noblemen such as the Earls of Essex, Clarendon and Brownlow, the railway line received Royal Assent in 1833.

Led by chief engineer Robert Stephenson, works commenced in 1834 to build a high railway embankment on top of the ruined barbican and moat of Berkhamsted Castle. The brick embankment was built on deep foundations using earth taken from the Sunnyside cutting a mile further south. Once railway tracks were laid, it was possible to use a steam locomotive to move earth and bricks: the Harvey Coombe (or Harvey Combe) was brought up from London by barge on the Grand Junction Canal to assist construction work, and was assembled at Pix Farm in Bourne End. When this locomotive began running on the line works, it was the first time any local people had seen a railway engine.

The L&BR line opened in 1837, with trains running between London and Boxmoor in July, with service extended to Tring in October of that year. The first passenger train passed through Berkhamsted on 16 October 1837, 59 minutes after leaving London.

Extension plans

Various plans were put forward in the 1880s by the LNWR (successor to the L&BR) to build a branch line from Berkhamsted to Chesham, but these were not realised. The Great Central Railway also considered a proposal to extend the branch from Chalfont Road to Chesham further north to Berkhamsted and Tring. This proposal was abandoned.

In 1887 there was a proposal to build a narrow-gauge steam tramway along the main road from Hemel Hempstead to Bourne End, and then along the Bourne Gutter Valley to Chesham. Campaigners sought to extend this route via Berkhamsted, but the project also came to nothing.

Development

In 2013, as part of its "Access for All" programme, Network Rail began construction work to install lifts to provide access for disabled passengers to platforms, as required by the Disability Discrimination Act 1995. Three lifts were completed and eventually opened for public use on Friday 13 March 2015, serving platforms 1, 2/3 and 4.

An electrical substation was installed outside the front of the station in April 2014 to improve the electricity supply to overhead wires on the West Coast Main Line. The installation, which is enclosed by metal railings, was criticised for its appearance and prominent position in front of a Victorian railway station and in close proximity to the 11th-century Berkhamsted Castle.

Services

At Berkhamsted, Monday to Saturdays there are 4 trains per hour southbound to London Euston. There are two trains an hour north to Tring, along with two to Milton Keynes Central, one of which is operated by Southern. There is also an hourly service to Northampton. Berkhamsted is also served by an hourly cross-London service operated by Southern which runs via the West London Line to Clapham Junction and South Croydon.

On Monday-Friday there is one train to and from Crewe and some services to/from Crewe on Sundays.

On Sundays there are hourly services towards Milton Keynes, Tring and Northampton, and three an hour towards London Euston.

Future development

In the London & South East Rail Utilisation Strategy (RUS) document published by Network Rail in 2011, a proposal was put forward to extend the Crossrail lines currently construction in central London along the West Coast Main Line as far as Tring. The diversion of rail services through central London would enable a direct link from stations such as Berkhamsted to West End stations such as Tottenham Court Road and would alleviate congestion at Euston station; Crossrail services currently planned to terminate at Paddington due to capacity limitations would also be able to continue further west, allowing for a more efficient use of the line. An announcement made in August 2014 by the then transport secretary Patrick McLoughlin indicated that the government was actively evaluating the possibility of extending Crossrail as far as Tring, however in August 2016, the Department for Transport confirmed that the scheme had been cancelled due to "poor overall value for money to the taxpayer".

References

Berkhamsted railway station Wikipedia