Purpose
  
Water supply

Construction began
  
1948

Height
  
34 m

Catchment area
  
960 km²

Operator
  
Bathurst Region

Country
  
Status
  
Operational

Length
  
455 m

Opened
  
10 November 1956

Primary inflow
  

Similar
  
Carcoar Dam, Windamere Dam, Winburndale Dam, Abercrombie Caves, Gosling Creek Dam

Ben chifley dam overflows torward bathurst 1440p


Ben Chifley Dam, or Chifley Dam, is a rock and earth-fill embankment dam across the Campbells River in the central west region of New South Wales, Australia. The main purpose of the dam is to supply potable water to the city of Bathurst.

Contents

The dam is named in honour of Ben Chifley, a former Prime Minister of Australia and Member for Macquarie.

Ben Chifley Dam Chifley Dam Bathurst NSW Sweetwater Fishing Australia

Ben chifley dam dick n nads fishing thrills


Location and featuresEdit

Ben Chifley Dam Evolving Picture Ben Chifley Dam

The dam is located 17 kilometres (11 mi) upstream of Bathurst. Water is released into the Campbells River which flows into the Macquarie River before being captured at the water treatment facility at Gorman's Hill, a suburb of Bathurst.

The dam wall is 34.4 metres (113 ft) high and 455 metres (1,493 ft) long and holds back 30,800 megalitres (1,090×10^6 cu ft) of water when at full capacity. The surface area of the reservoir is 2.2 hectares (5.4 acres) and the catchment area is 960 square kilometres (370 sq mi). The 455 metres (1,493 ft) long uncontrolled side-channel concrete spillway and six plug auxiliary fuse plug spillway has a discharge capacity of 9,800 cubic metres per second (350,000 cu ft/s). With an average daily inflow of around 35 megalitres (1.2×10^6 cu ft) per day, as at April 2013, filtered water consumption averaged 18.9 megalitres (670×10^3 cu ft), with a further 8.4 megalitres (300×10^3 cu ft) of treated water returned to the Macquarie River.

HistoryEdit

Ben Chifley Dam Red alert at Chifley Dam Western Advocate

Construction of Ben Chifley Dam started in 1948 and was completed eight years later. It was officially opened by the Premier of New South Wales, Joseph Cahill on 10 November 1956. The dam then succeeded Winburndale Dam as the potable-water supply for Bathurst. Winburndale Dam had been built in 1934 with an expected life of 20 years. Since completion of Ben Chifley Dam, Winburndale has been used to supply raw water for park watering and industrial use.

Ben Chifley Dam Ben Chifley Dam off table Central Western Daily

Plans to upgrade the Ben Chifley Dam commenced in 1989 after it was realised it did not meet the New South Wales Dam Safety Committee's safety recommendations and could fail in the event of a severe flood. A flood in August 1998, the worst recorded in 175 years, caused water to run over the spillway at a depth of 2.74 metres (9.0 ft), just 0.1 metres (0.33 ft) below the level at which the wall was expected to fail. An evacuation plan was implemented downstream.

Construction to upgrade the dam started in 1999. The top of the wall was raised by 5.4 metres (18 ft) and the spillway was extended by 30 metres (98 ft), increasing the dam's capacity from 16,000 megalitres (570×10^6 cu ft) to 30,800 megalitres (1,090×10^6 cu ft).