Neha Patil (Editor)

Bebington railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Bebington

Station code
  
BEB

DfT category
  
E

Number of platforms
  
2

Grid reference
  
SJ333850

Managed by
  
Merseyrail

2011/12
  
1.216 million

Pte
  
Merseytravel

Bebington railway station

Address
  
Bebington, Wirral CH63 7LA, United Kingdom

Local authority
  
Metropolitan Borough of Wirral

Similar
  
Spital railway station, Rock Ferry railway station, Leasowe railway station, Green Lane railway st, Moreton (Merseyside) railway st

Bebington railway station serves the town of Bebington on the Wirral Peninsula, England. The station is situated on the Chester and Ellesmere Port branches of the Wirral Line, forming part of the Merseyrail network.

Contents

History

The station is on the former Chester and Birkenhead Railway, which formally opened in 1840.

The station was officially renamed from Bebington & New Ferry to Bebington on 6 May 1974.

Direct train services to Liverpool began in 1985, when the line between Rock Ferry and Hooton was electrified; previously passengers for Liverpool had to change at Rock Ferry. Further electrification in early 1990s allowed electric train services to be extended, first to Chester in 1993 and then Ellesmere Port in 1994.

In early June 2014 it was announced that this station would be among a small number of stations across the Merseyrail network that will be spruced up as part of a £3.7m programme of improvements, this station would see refurbishment and improvement of passenger areas and improvements to lighting and CCTV coverage. Between mid February and Mid March 2015, the Subway leading to Platform 1 was refurbished. An electronic information board was also added at the street entrance.

Facilities

The station is staffed, during all opening hours, and has platform CCTV. There is a payphone, a vending machine and a booking office. There are live departure and arrival screens, on the platform, for passenger information. Each of the two platforms has sheltered seating. The station has a free car park, with 24 spaces, and also has a cycle locker with 25 spaces. Access to the station and both platforms is by ramp, allowing easy access for passengers with wheelchairs or prams.

Services

Trains operate every 15 minutes between Chester and Liverpool on weekdays and Saturdays until late evening when the service becomes half-hourly, as it is on Sundays. Additionally there is a half-hourly service between Liverpool and Ellesmere Port all day, every day. Northbound trains operate via Hamilton Square station in Birkenhead and the Mersey Railway Tunnel to Liverpool. Southbound trains all proceed as far as Hooton, where the lines to Chester and Ellesmere Port divide. These services are all provided by Merseyrail's fleet of Class 507 and Class 508 EMUs.

References

Bebington railway station Wikipedia