Puneet Varma (Editor)

Balloki Power Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
Balloki Power Plant

Location
  
Pattoki, Punjab

Commission date
  
2018 (expected)

Construction cost
  
919.9 million USD

Country
  
Pakistan

Status
  
Under Construction

Construction began
  
November 2015

Balloki Power Plant

Owner(s)
  
National Power Parks Management Company Pvt. Ltd (EPC: Harbin Electric International Company Limited)

Project briefing by ceo at ground breaking ceremony of balloki power plant 10 11 2015


The Balloki Power Plant is a 1,223 MW natural gas power plant currently under construction near Pattoki, in the Punjab province of Pakistan. Groundbreaking was commenced by Prime Minister Nawaz Sharif on November 11, 2015, and construction is scheduled for completion by December 2017. The project will utilize regasified liquefied natural gas (RLNG) for fuel, with diesel as an alternate backup. A 40 kilometer long transmission line with a capacity of 500 kilovolts will also be constructed between the new plant and a grid station in southern Lahore.

Contents

Bidding was open to international firms for the 82 billion ruppee project. China’s Harbin Electric Company was announced as the lowest evaluated bidder for the project on October 2, 2015, having offered a levellised electricity cost of 7.973 cents per unit, outbidding the Turkish conglomerate Enka İnşaat ve Sanayi A.Ş. and GE Consortium which both stood in second with 8.185 cents per unit tariff, followed by China Machinery Eng Co (CMEC) & SEFC at 8.304 cents, and Hyundai Engineering at 8.332 cents per unit.

Project Financing

Plans for the project call for private sector investment to construct the plant, with the private company then selling electricity to the government of Pakistan at pre-negotiated rates. It is not financed under CPEC projects. As the project is to be constructed largely by the private sector, financing loans for the project do not fall under the concessionary loan agreement which finances CPEC projects, but it will still qualify for subsidized loans with an interest rate of 5% which are to be dispersed by the Exim Bank of China. For comparison, loans for previous Pakistani infrastructure projects financed by the World Bank carried an interest rate between 5% and 8.5%, while interest rates on market loans approach 12%.