Puneet Varma (Editor)

Avonmouth Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Crosses
  
River Avon, Bristol

Design
  
Cantilever

Longest span
  
538 ft (164 m)

Opened
  
May 1974

Total length
  
1,388 m

Bridge type
  
Cantilever bridge

Locale
  
Shirehampton, England

Width
  
132.5 ft (40 m)

Address
  
M5, Bristol, UK

Clearance below
  
30 m

Location
  
Shirehampton

Body of water
  
River Avon

Avonmouth Bridge

Carries
  
8 lanes of the M5 motorway Bridleway

Similar
  
Avon Bridge, Edmunds Tower, Avonmouth railway station, Shirehampton railway station, Bristol Marina

030408 called to dinghy under avonmouth bridge


The Avonmouth Bridge is a road bridge that carries the M5 motorway over the River Avon into Somerset near Bristol, England. The main span is 538 ft (164 m) long, and the bridge is 4,554 ft (1,388 m) long, with an air draught above mean high water level of 98.4 ft (30 m). It also has a separate footpath and cycleway which connects with Avonmouth station.

Contents

M5 avonmouth bridge


Construction

The bridge was built with three lanes each way, with full hard shoulders. In 2002-04, it was widened to four lanes each way, with the result that the hard shoulders are no longer of full width.

The bridge was built to allow tall ships underneath. This gave the bridge steep gradients that cause heavy vehicles to slow down, resulting in congestion during rush hour and the summer tourist season: traffic can back up both on the bridge and on the approaches.

The construction contract was let to Fairfield-Mabey and commenced in 1969; Fairfield-Mabey placed a sub-contract with Tarmac Civil Engineering for the foundations, piers and deck concreting works.

Surface

The approach and initial climb up the bridge have a smooth asphalt surface; however, on the top of the bridge the surface was uneven and bumpy when it was built. In September 2006, it was announced that the entire bridge would be resurfaced, only five years after the last resurfacing. This was completed in November 2009 by the construction firm Stirling Lloyd. However, the surfacing was carried out by the Swiss firm Aeschlimann using its own workforce and also importing all the plant used. A new type of asphalt called Gussasphalt was used on the bridge deck. In addition to having a smooth, skid-resistant finish, it requires no compaction and can be applied in very thin layers, thus reducing the weight added to the bridge. It is also flexible and as a result should last longer than the previous resurfacing.