Rahul Sharma (Editor)

Asansol–Tatanagar–Kharagpur line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Operational

Opened
  
1891 onwards

Owner
  
Indian Railways

Locale
  
West Bengal, Jharkhand

Operator(s)
  
South Eastern Railway

Asansol–Tatanagar–Kharagpur line

Track gauge
  
Broad gauge 1,676 mm (5 ft 6 in)

Electrification
  
1961-63 with 25 kV AC overhead line

Terminis
  
Kharagpur Junction railway station, Asansol Junction railway station

The Asansol–Tatanagar–Kharagpur line is part of Howrah and eastern India's links with Mumbai and Chennai. It is also a major freight line for transporting iron ore, coal and steel products. This page includes the Adra-Gomoh branch line and Tatanagar-Badampahar branch lines.

Contents

History

The Howrah–Allahabad–Mumbai line, a joint effort of Great Indian Peninsula Railway and East Indian Railway Company came up in 1870. The Bengal Nagpur Railway was formed in 1887 for the purpose of upgrading the Nagpur Chhattisgarh Railway and then extending it via Bilaspur to Asansol, in order to develop a shorter Howrah-Mumbai route than the one via Allahabad. The Bengal Nagpur Railway main line from Nagpur to Asansol, on the Howrah-Delhi main line, was opened for goods traffic on 1 February 1891. However, it was only after Kharagpur was linked from the west and the south that it was connected to Howrah in 1900.

The closing years of the 19th century and the opening years of the 20th century were momentous for the area. 800 miles of East Coast Railway was built and opened for traffic between 1893 and 1896. The most vital sections of Bengal Nagpur Railway, Sini-Kharagpur-Kolaghat and Kharagpur-Cuttack, were opened to traffic in 1898-99. The Purlia-Ranchi branch was opened for traffic on 15 November 1907. BNR lines were extended to Gomoh, on EIR’s main line, in 1907. The Mohuda-Chandrapura branch line was opened in 1913.

A 40-mile branch line from Tatanagar to Gorumahisani was opened to traffic in 1911 mainly for transportation of iron ore.

The Purulia-Ranchi line was opened as a narrow gauge railway of BNR in 1907.

Railway reorganization

The Bengal Nagpur Railway was nationalized in 1944.Eastern Railway was formed on 14 April 1952 with the portion of East Indian Railway Company east of Mughalsarai and the Bengal Nagpur Railway. In 1955, South Eastern Railway was carved out of Eastern Railway. It comprised lines mostly operated by BNR earlier.

Steel plants and freight traffic

India’s first integrated steel plant, Tata Steel’s plant at Jamshedpur, became operational in 1908.IISCO Steel Plant was established at Burnpur in 1918.Steel Authority of India’s Durgapur Steel Plant was established in the late fifties, and Bokaro Steel Plant became operational in the seventies.

Although the Asansol-Gaya section of Grand Chord and Bardhaman-Asansol section of Howrah-Delhi main line serves as the principal links for Jharia Coalfield and Raniganj Coalfield this line also links to both the coalfields.

With four steel plants served by these lines South Eastern Railway transports bulk of the raw materials like coal and iron ore used by the steel industry. It loaded 61.24 million tonnes during the period April to September 2012. Indian Railway handled 456 million tonnes of coal in 2011-12. It was the single largest item of freight traffic. It handled 104.71 million tonnes of Iron ore in 2011-12.

Electrification

The Asansol-Purulia, Purulia-Chakradharpur, Kandra-Gamharria and Sini-Adityapur sectors were electrified in 1961-62. The Tatanagar-Kharagpur sector was electrified in 1962-63.

Passenger movement

Asansol, Tatanagar and Kharagpur, on this line, are amongst the top hundred booking stations of Indian Railway.

References

Asansol–Tatanagar–Kharagpur line Wikipedia