Puneet Varma (Editor)

Łódź Fabryczna railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Łódź,  Poland

Opened
  
1865

Platforms in use
  
4

Previous names
  
Litzmannstadt Mitte

Owner
  
Polish State Railways

Łódź Fabryczna railway station

Owned by
  
Polskie Koleje Państwowe S.A.

Address
  
Plac Bronisława Sałacińskiego 1, 90-001 Łódź, Poland

Similar
  
Łódź Kaliska railway st, Łódź Widzew railway st, Manufaktura, Warszawa Wschodnia railway st, Warszawa Zachodnia station

The new central station in lodz poland d fabryczna railway station


Łódź Fabryczna is the largest and most modern railway station in the industrial city of Łódź, Poland. It was originally constructed at the initiative of industrialist Karol Scheibler in 1865. In the old Polish classification of stations it was placed under the B category.

Contents

The station is located in the centre of Łódź. Trains depart frequently via Koluszki to Warszawa Wschodnia, Kraków, Radom, Częstochowa, and Tomaszów Mazowiecki. It was closed on 16 October 2011 as a part of a major redevelopment project to build a new railway station and transport interchange and reopened on 11 December 2016.

The new central station in lodz poland d fabryczna railway station


History

Building of the Łódź – Koluszki railway line began on 1 September 1865 after authorization was obtained from Tsar Alexander II in July 1865. The new line linked Łódź with the Warsaw-Vienna Railway which was finished in 1848. Rails were laid simultaneously from Łódź and from Koluszki. By 18 November 1865 freight services began to use the line. Passenger services began the following June.

Construction of the railway was the beginning of the creation of the Łódź Circle Line.

Initially the station was further west on the site of the present Łódzki Dom Kultury (Łódź Cultural Centre). The track extended almost to ulica Sienkiewicza (Sienkiewicz Street). In 1868 a new station was built designed by the Warsaw-based architect Adolf Schimmelpfennig. The station was extended in 1930. In June 2012 the station was demolished to make way for the building of a new station below ground level.

Rebuilding

The modernization of the Łódź – Warsaw line includes building a new station below ground level, just north of the site of the former Łódź Fabryczna station. A ramp, leading to a new tunnel, begins immediately after Łódź Widzew station, and the tunnel itself starts near the site of Łódź Niciarniana station. Initially it was planned to change the name of the station to Łódź-Central or Central, but according to the latest plans, the station name will not change because it is too well associated with the current station.

The station was originally envisaged to service new high-speed trains that were to run on a new high-speed line, the 'Y' line, intended to link Warsaw via Łódź and Kalisz to Wrocław and Poznań. Due to the latest estimated cost of 10 billion Euro, the high-speed line was put on hold by Sławomir Nowak, the Ministry of Transport, Construction and Marine Economy at the time of the decision.

Moving Łódź Fabryczna below ground releases land for development near the city centre. A modern transport interchange is envisaged between PKP trains, MPK Łódź trams, buses and PKS coaches. The railway line is to be extended in a new cross-city twin-track tunnel to Łódź Kaliska railway station.

In November 2010 PKP PLK announced a list of five consortia that had been invited by the railway infrastructure manager to tender to build the underground station. Work was to be completed in 2014.

In 2013 the estimated cost of the project was given as ranging from 1.7 to 1.9 billion PLN and the completion date was unknown. Reconstruction works finished in December 2016 and the station has reopened.