Country Austria Opening date 1986 Impounds Ziller River Height 186 m Catchment area 67 km² Construction began 1981 | Status Operational Type of dam Arch, variable-radius Length 502 m (1,647 ft) Opened 1986 Owner Verbund Impound Ziller | |
![]() | ||
Similar Alps, Lai da Curnera, Gepatschspeicher, Herzsee, Lichtsee |
The Zillergründl Dam is an arch dam on the Ziller River in the upper Ziller Valley of Tyrol state, Austria. It is 16 km (10 mi) east of Mayrhofen. The primary purpose of the dam is hydroelectric power production and it supports a 360 MW pumped-storage power station. As part of the Zemm-Ziller Development, construction on the dam began in 1981 and it along with the Häusling Pumped Storage Power Plant were complete in 1986. The power plant was fully commissioned by 1988. The dam is the second tallest in Austria.
Contents
Map of Zillergr%C3%BCndl, 6290, Austria
Design and operationEdit
At an elevation of 1,850.7 m (6,072 ft) above sea level, the Zillergründl is a 186 m (610 ft) tall and 502 m (1,647 ft) long variable-radius arch dam with a structural volume of 1,373,000 m3 (1,795,816 cu yd). The dam is 6 m (20 ft) wide at its crest and 36 m (118 ft) at its base. Its reservoir has a capacity of 89,500,000 m3 (72,559 acre·ft), of which 88,800,000 m3 (71,991 acre·ft) is active (or "useful") capacity. At normal levels, the reservoir has a surface area of 67 km2 (26 sq mi). The reservoir operates at elevations from 1,850 m (6,070 ft) to 1,740 m (5,709 ft) which is the draw-down level.
Water released from the reservoir reaches the Häusling Power Plant 10 km (6 mi) downstream. The power plant is located at an elevation of 1,060 m (3,478 ft) and contains two 180 MW Francis turbine-generators. It is afforded 744 m (2,441 ft) of hydraulic head given the difference in elevations. Using its pumped-storage capability, the power-station receives water from the Stillupp Reservoir 8 km (5 mi) to the west in an adjacent valley at 47°07′17″N 11°51′58″E and pumps it up to the Zillergründl Reservoir. The pumping and replenishment of the reservoir occur at night, during low energy demand periods. The process is repeated; electricity is generated during high-demand periods and pumping occurs during low-demand periods when electricity is cheaper.