Carries A6 motorway Official name Viadukt Zečeve Drage Opened 2004 Longest span 50 m Bridge type Box girder bridge | Locale Gorski Kotar, Croatia Design Box girder bridge Total length 939 m Location Gorski kotar Carry A6 | |
![]() | ||
Maintained by Autocesta Rijeka–Zagreb Width 2 × 12.9 m (42 ft 4 in) Similar Severinske Drage Viaduct, Kamačnik Bridge, Bajer Bridge, Tuhobić, Box girder bridge |
The Zečeve Drage Viaduct is located between the Bosiljevo 2 and Vrbovsko interchanges of the A6 motorway in Gorski Kotar, Croatia, just to the west of the Veliki Gložac Tunnel. It is 939.2 metres (3,081 ft) long. The viaduct consists of two parallel structures: the first one was completed in 2004, and the second one in 2008. The viaduct is tolled within the A6 motorway ticket system and there are no separate toll plazas associated with its use. The viaduct was completed by Viadukt.
Contents
Structure description
At this location the motorway route follows a horizontal curve with a radius of 2,505.1 metres (8,219 ft). The deck of the viaduct follows a 26,500-metre (86,900 ft) radius concave vertical curve, and the longitudinal grade of the road carried by the viaduct ranges from 4.38% to 0.78%. The viaduct is a box girder structure supporting the deck across nineteen spans: two of 40 m (130 ft), sixteen of 50 m (160 ft) and one of 40 m (130 ft). The viaduct piers range from 18.72 m (61.4 ft) to 53.04 m (174.0 ft) in height. The superstructure of the viaduct comprises a box cross section made from pre-stressed reinforced concrete, put in place by incremental launching due to the considerable height of the structure. The launching was carried out downhill, because of the substantial grade of the superstructure, with two VBT 19×140 cable stays as a braking mechanism for the 20,000 tonnes (20,000 long tons; 22,000 short tons) box girder. The cross-sections of the box girder and the piers are virtually identical to those of Bajer Bridge.
Traffic volume
Traffic volumes are regularly measured and reported by Autocesta Rijeka–Zagreb, the operator of the viaduct and A6 motorway where the structure is located, and published by Hrvatske ceste. Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries a large amount of tourist traffic to the Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales.