Supriya Ghosh (Editor)

West Ealing railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
West Ealing

Managed by
  
Great Western Railway

DfT category
  
E

Address
  
London, United Kingdom

Local authority
  
London Borough of Ealing

Grid reference
  
TQ166807

Station code
  
WEA

Fare zone
  
3

Number of platforms
  
3

Original company
  
Great Western Railway

West Ealing railway station

Similar
  
Ealing Broadway station, Northfields tube station, Drayton Green railway st, South Ealing tube station, Hanwell railway station

Passenger trains at west ealing railway station wednesday 22nd february 2017


West Ealing railway station is on the Great Western Main Line in Ealing, west London. It is 6 miles 46 chains (10.6 km) down-line from London Paddington and is situated between Ealing Broadway to the east and Hanwell and to the west. Its three-letter station code is WEA.

Contents

The station and all main line trains serving it are currently operated by Great Western Railway. It is also served by Heathrow Connect. The station is staffed for part of the day.

Gwr morning greenford and west ealing railway stations


History

The station was opened in 1871 as Castle Hill and Ealing Dene on the Great Western Railway, which was constructed from London Paddington through Ealing to Maidenhead in 1836–1838. From 1 March 1883, the station—then named Castle Hill (Ealing Dean)—was served by District Railway services running between Mansion House and Windsor. This service was discontinued as uneconomic after 30 September 1885. The station was located next to the London Co-operative Society's main creamery, and so was equipped with a dedicated milk train platform.

Originally the station consisted of four platforms in a staggered layout: platform 1 and the island comprising platforms 2 and 3 to the west of the Drayton Green Road bridge, and platform 4 on the east side. Platform 1 (along with a siding leading up to it) was demolished in 1973, followed by platform 2 being fenced off in early 1991 as trains on the main line no longer serviced the station. Platform 4 was demolished and moved west of the bridge in 1990, partially covering the site of the then long-closed milk depot. The current station building was completed in early 1987, following the demolition of the previous one a year earlier. A west-facing terminating platform, platform 5, was added in 2016 for trains on the Greenford branch.

Accidents and incidents

On 5 August 1989, an express passenger train travelling from Oxford to Paddington collided with a piece of rail left on the track, probably by vandals, and the locomotive, Class 50 50025 Invincible, was derailed along the points near to platform 2 (these points were removed by November of that year). There were no serious injuries.

Services

Presently there are five lines (two for fast services out of Paddington), but only platforms 3–5 exist. There are also the remains of another platform next to platform 5, which is the now long-closed LCS dedicated milk depot platform.

The station is served by local services operated by Great Western Railway from Paddington to Hayes and Harlington and Heathrow Connect services from Paddington to Heathrow Airport. It is on the original line of the Great Western Railway. The restricted facilities are an intermittently open booking office and a ticket machine. The station is in Travelcard Zone 3. On weekdays and Saturdays, West Ealing is served by ten trains an hour, four going to London Paddington, four going to Hayes and Harlington, of which two continue to Heathrow Airport, and two to Greenford that terminate at West Ealing. The station is closed on Sundays.

Since October 2008, Oyster "pay as you go" can be used for journeys originating or ending at West Ealing.

In September 2016, Great Western Railway began operating services using EMUs, which led to some Greenford services that had previously run to Paddington to terminate at West Ealing using the newly converted terminal platform. All Greenford services terminate at West Ealing from January 2017.

Connections

London Buses routes E7 and E11 serve the station.

Future

There are plans to provide Crossrail services at the station from 2018. As part of this proposal, services from the Greenford Branch Line will terminate at West Ealing. Network Rail is creating capacity for this by converting the former LCS milk train bay into an extra bay platform, which was completed in mid-2016. In addition, various further alterations will be made by Network Rail by the end of 2017:

  • New station building with a larger ticket hall with level access from Manor Road (to the north of the station)
  • Step-free access
  • Platforms 3–4 extended to enable 10-car trains to stop
  • Improved passenger facilities including increased lighting, a new canopy on platform 4, and information and security systems