Warsak Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Opening date
  
1960

Impounds
  
Opened
  
1960

Spillway capacity
  
540 m3/s (19,070 cu ft/s)

Status
  
Operational

Type of dam
  
Gravity

Height
  
76 m

Location
  
Annual generation
  
1100 GWh

Warsak Dam httpsctribunecompk2016051098602RawalDamx

Owner(s)
  
Water and Power Development Authority

Active capacity
  
31,207,090 m3 (25,300 acre·ft) (design, now silted)

Similar
  
Tarbela Dam, Mangla Dam, Gomal Zam Dam, Allai Khwar Hydropower Plant, Munda Dam

Warsak dam peshawar pakistan


Warsak Dam is a mass concrete gravity dam located on the Kabul River approximately 20 km northwest of the city of Peshawar in Khyber Pakhtunkhwa province of Pakistan.

Contents

Map of Warsak Dam, Pakistan

Warsak dam


HistoryEdit

Warsak Dam was completed under the Colombo Plan in two phases and financed by the Canadian Government. The first phase was completed in 1960 and consisted of the construction of the dam. Irrigation tunnels and installation of four power generating units, each of 40 MW capacity with 132 kV transmission system, were also completed in 1960. Two additional generating units of 41.48 MW capacity each were added in 1980-81 in the second phase.

CapacityEdit

The total installed capacity of the Warsak Dam Hydropower Project is 243 MW. In June 2012, the Pakistan Water and Power Development Authority (WAPDA) decided to add a 375 MW powerhouse to Warsak, which will raise Warsak's total power generation capacity to 525 MW. No date was given on when the project would be complete.

RehabilitationEdit

Germany will loan 40 million euros to Pakistan for the rehabilitation of the Warsak hydroelectric power station built over half a century ago on Kabul River in Khyber Pakhtunkhwa. According to Water and Power Development Authority, this is the second time that Warsak hydroelectric power station will be renovated. They plan to overcome several problems, including regaining the capacity loss of 30MW with reliable annual energy generation of 1,144GWh, upgrade and modernise the old system, and achieve another life cycle of 30 to 40 years. The current rehabilitation work will be financed by Germany, France and the European Union Extension is being planned.Germany and France will loan 40 million euros each to Pakistan for the rehabilitation of the Dam. The total cost of the project is euro 162m and it is being co-financed with the German Development Bank (KfW), European Investment Bank (EIB), French Agency for Development (AFD) and Pakistan government contributions.

References

Warsak Dam Wikipedia