Status Operational Opened 1872 Track length 65 km (40 mi) | Number of tracks 2 | |
Terminis Surendranagar Junction railway station, Viramgam railway station |
The Viramgam–Surendranagar section covers a distance of 65 km in Gujarat.
Contents
History
During 19th century Viramgam railway station owned by BB&CI. During which Ahmedabad–Viramgam section was laid. In 1872 BB&CI line was extended to Surendranagar. Later Broad gauge network up to Surendranagar was extended in 1879 by BB & CI Railway The gauge conversion of Viramgam–Hapa section in the year 1980.
Doubling
Doubling of Viramgam Surendranagar section has been completed since October 2015. Trains have started to ply on the newly laid up line.
References
Viramgam–Surendra Nagar section Wikipedia(Text) CC BY-SA