Urengoy–Pomary–Uzhgorod pipeline

Passes through
  
Izhevsk, Yelets, Kursk, Romny, Zhmerynka, Bohorodchany, Ivano-Frankivsk

Runs alongside
  
Progress pipeline, Soyuz pipeline, Bratstvo pipeline

The Urengoy–Pomary–Uzhgorod pipeline (also known as the West-Siberian Pipeline, or Trans-Siberian Pipeline) is one of Russia's main natural gas export pipelines, partially owned and operated by Ukraine.

Contents

History

The pipeline project was proposed in 1978 as an export pipeline from Yamburg gas field, but was later changed to the pipeline from Urengoy field, which was already in use. In July 1981, a consortium of German banks, led by Deutsche Bank, and the AKA Ausfuhrkredit GmbH agreed to provide 3.4 billion Deutsche Mark in credits for the compressor stations. Later finance agreements were negotiated with a group of French banks and the Japan Export-Import Bank (JEXIM). In 1981-1982, contracts were signed with compressors and pipes suppliers Creusot-Loire, John Brown Engineering, Nuovo Pignone, AEG-Telefunken, Mannesmann, Dresser Industries, and Japan Steel Works. Pipe-layers were bought from Caterpillar Inc. and Komatsu.

The pipeline was constructed in 1982-1984. It complemented the transcontinental gas transportation system Western Siberia-Western Europe which existed since 1973. The official inauguration ceremony took place in France.

On 19 July 2011, UkrTransGaz started modernization of the pipeline.

Route

The pipeline runs from Siberia's Urengoy gas field through compressor plant in Pomar, Mari El to Uzhgorod in Western Ukraine. From there, the natural gas is transported to Central and Western European countries. Together with Soyuz and Progres pipelines it forms the western transit corridor in Ukraine. It crosses the Russian–Ukrainian border north of Sumy. In Ukraine, it takes gas to the Uzhgorod pumping station on the Ukrainian border with Slovakia and to smaller pumping stations on the Hungarian and Romanian borders. The pipeline crossed the Ural Carpathian mountains and more than 600 rivers including Ob, Volga, Don and Dnepr rivers.

Technical features

The pipeline is 4,500 kilometres (2,800 mi) long, of which 1,160 kilometres (720 mi) in Ukraine. Its diameter is 56 inches (1,420 mm). The original annual capacity of the pipeline was 32 billion cubic metres (1.1 trillion cubic feet) of natural gas per year. By 2009, the factual annual capacity was 27.9 billion cubic metres (990 billion cubic feet). It has 42 compressor stations, of which nine in Ukraine.

The telecommunications and cathodic protection systems of the pipeline were installed by Alcatel of France. The pipeline utilizes 85 dual CCTV stations for telecommunications.

Operators

The Russian section of this pipeline is operated by Gazprom and the Ukrainian section is operated by UkrTransGaz.

Disagreement among the allies

The Soviet plans to build the pipeline were considered a threat to the balance of energy trade in Europe, and were strongly opposed by the Reagan administration. The United States prevented U.S. companies from selling supplies to the Soviets for the pipeline, as part of what was also retribution against the Soviets for their policies towards Poland.

America's Western European allies, however, refused to bow to U.S. pressure to boycott the pipeline, insisting that contracts already signed between the Soviets and European companies needed to be honored. This led to several European companies being sanctioned by the U.S. Government. Reagan reportedly said "Well, they can have their damned pipeline. But not with American equipment and not with American technology." The efforts by the U.S. pressure to prevent the construction of the pipeline, and its export embargo of supplies for the pipeline (1980–1984) constituted one of the most severe transatlantic crises of the Cold War.

Construction controversy

The construction of the pipeline was also subject to a United States Congressional hearing investigating the use of imported Vietnamese labor from re-education camps to build the pipeline.

Accidents

The pipeline's first accident occurred even before the commissioning of the pipeline. On 15 December 1983, a fire broke out at a compressor station in Urengoy, destroying electronic monitoring devices and control panels, but no one was injured.

On 7 May 2007, the pipeline exploded near the village of Luka. The explosion damaged 30 meters of the pipeline. A second explosion happened on 6 December 2007 near the village of Tiahun.

A terrorist explosion damaged the pipeline in Rozhniativ district in Ivano-Frankivsk Oblast in May 2014. According to the Russian government owned radio station Voice of Russia terrorist threats against the pipeline were made by Right Sector leader Dmytro Yarosh in March 2014.

Another section of the pipeline exploded in the Poltava region on June 17, 2014, one day after Russia limited the supply of gas to Ukrainian customers due to non-payment. Ukraine's Interior Minister Arsen Avakov said the next day, that the explosion had been caused by a bomb.