Kalpana Kalpana (Editor)

USS Yellowstone (AD 41)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Laid down
  
27 June 1977

Decommissioned
  
31 January 1996

Construction started
  
27 June 1977

Length
  
196 m

Displacement
  
18.38 million kg

Commissioned
  
28 June 1980

Struck
  
4 July 1999

Launched
  
27 January 1979

Weight
  
20,590 tons

USS Yellowstone (AD-41) Destroyer Tender Photo Index AD

Status
  
National Defense Reserve Fleet

The third USS Yellowstone (AD-41) was the lead ship of the Yellowstone class of destroyer tenders in the United States Navy. These ships are also considered as flight II of the Samuel Gompers class of tenders built in the 1960s. The other ships in the class were: Acadia (AD-42), Cape Cod (AD-43) and Shenandoah (AD-44).

Contents

Building and Commissioning

USS Yellowstone (AD-41) httpsuploadwikimediaorgwikipediacommonsthu

Yellowstone was laid down on 2 June 1977 at San Diego, California, by the National Steel and Shipbuilding Company; launched in January 1979; sponsored by Mrs. Donald C. Davis, the wife of Admiral Donald C. Davis, the Commander in Chief of the U.S. Pacific Fleet and commissioned on 28 June 1980. Following post-commissioning workups, Yellowstone transited from San Diego to her homeport of Norfolk, Virginia.

Service history

USS Yellowstone (AD-41) 17 Best images about USS YELLOWSTONE AD41 on Pinterest Navy rates

Yellowstone deployed for the first time in support of NATO exercise Ocean Venture "81". During this deployment, the Repair Department, under simulated wartime conditions, completed over 100 jobs during a three-day anchorage in Scapa Flow, Scotland.

USS Yellowstone (AD-41) USS Yellowstone Ad 41 I was stationed on this ship United States

In 1984, Yellowstone deployed for a second time for NATO exercise United Effort-Teamwork "84", Yellowstone completed over 300 jobs, sending "Tiger Teams" of repair personnel to other ships and providing logistic support by transferring repair parts and supplies and pumping fuel and water to ships of the task force. It was during this deployment that Yellowstone crossed the Arctic circle officially becoming a "Bluenose".

1985 The ship made its first ever cruise to the Mediterranean Sea.

USS Yellowstone (AD-41) USS Yellowstone AD41 The namesake ship for the last cla Flickr

In May 1994 Yellowstone returned to her homeport of Norfolk, VA. Finishing up a work-intensive Mediterranean deployment, Yellowstone proved her reliability to the fleet through the many tasks it accomplished, living up to its nickname, "Old Faithful". Dedicating more than 119,088 man-hours throughout her four-month deployment, Yellowstone crewmembers completed more than 3,400 jobs through 17 major alongside repair availabilities on ships and 45 fly-away teams.

Gulf War

During the Gulf War, the destroyer tenders Yellowstone (AD-41), Acadia (AD-42) and Cape Cod (AD-43) were deployed to provide the logistic requirements of a sustained naval presence. Based in the Red Sea port of Jeddah, Saudi Arabia, Yellowstone provided critical repair and rearming capability to the fleet. During seven months on station Yellowstone alone completed more than 10,000 repair jobs on 30 U.S. and allied ships. The Navy men and women serving aboard Yellowstone and the other tenders and repair ships provided a wide variety of services simultaneously to as many as flve ships moored alongside or nearby. She also earned a Naval Unit Commendation for her service in the Gulf War. President George H. W. Bush also mentioned this ship by name as being the first naval command in a combat zone to have women serving on it.

Decommissioning

After only 16 years of service to the fleet, Yellowstone was decommissioned on 31 January 1996, at Norfolk. Following the decommissioning ceremony, Yellowstone was placed in a stand-by status at the Naval Inactive Ships Maintenance Facility in Philadelphia. In order to maintain the readiness of the recently decommissioned destroyer tenders in case world events required further use, two Yellowstone-class destroyer tenders were placed in "reduced operating status" [ROS], partially crewed by Naval Reservists. The Military Sealift Command was responsible for lay berthing, maintaining, and operating the ships. Approximately 2,000 reservists filled billets in the repair, communications, supply (excluding food service), and medical/dental departments. Mobilization training for the Reservists took place at Shore Intermediate Maintenance Activities, Navy medical and dental facilities, and on board active tenders. After this period of "ROS" Yellowstone was transferred to the James River Reserve fleet and in 1999 she was struck from the Naval Vessel Register. On 28 July 2001, Yellowstone was transferred to the control of the Maritime Administration for further disposal. On 17 December 2014, the ex-Yellowstone was sold for dismantlement and removed from the James River Reserve Fleet and withdrawn from MARAD inventory.

References

USS Yellowstone (AD-41) Wikipedia


Similar Topics