Girish Mahajan (Editor)

USS Westmoreland (APA 104)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Laid down
  
8 December 1943

Commissioned
  
18 January 1945

Renamed
  
Steel King

Launched
  
28 April 1944

Displacement
  
7.348 million kg

Christened
  
USS Westmoreland

Decommissioned
  
5 June 1946

Construction started
  
8 December 1943

Length
  
150 m

Builder
  
Ingalls Shipbuilding

USS Westmoreland (APA-104) wwwnavsourceorgarchives1003100310403jpg

Namesake
  
Counties in Pennsylvania and Virginia

USS Westmoreland (APA-104) was a Bayfield-class attack transport that served with the US Navy during World War II.

Contents

Westmoreland was laid down under a Maritime Commission contract (MC hull 872) on 8 December 1943 at Pascagoula, Mississippi, by Ingalls Shipbuilding, launched on 28 April 1944, and placed in reduced commission for ferrying purposes, on 12 July 1944. Shifted to Todd Shipyards of Hoboken, New Jersey, for conversion to an attack transport, the ship was decommissioned on 22 July for the duration of the yard period. Once the task of fitting the ship out as an attack transport was completed, Westmoreland was placed in commission on 18 January 1945, Capt. James M. Hicks in command.

Operational history

After spending most of February on shakedown in Chesapeake Bay, Westmoreland sailed for the Pacific on 22 February and arrived at the eastern entrance to the Panama Canal on the 27th. After transiting the canal, the attack transport pushed on for the Hawaiian Islands and reached Pearl Harbor on 14 March.

Transport and training operations

After training in Hawaiian waters, the ship returned to the west coast at the end of May for voyage repairs at San Pedro, California. In mid-June, she shifted northward to load troops and cargo at Portland, Oregon, for transportation to Hawaii. Westmoreland subsequently conducted one round-trip voyage between Pearl Harbor and San Francisco in July and then spent most of the first half of the month of August on exercises and further training in Hawaiian waters. During that time, the Japanese, worn down by ceaseless Allied pounding from the air and from the sea, surrendered on 15 August 1945.

Occupation and demobilization missions

Although Westmoreland had been commissioned too late to participate in combat against the Japanese in the Pacific, she nevertheless did take part in the massive reverse movement of men back to the United States, Operation Magic Carpet. The attack transport subsequently called at Manila, in the Philippines, and Sasebo, Japan, operating with Transport Squadron 22, and brought back troops to Portland, before she returned to the Philippines once more. She carried a draft of troops from Samar to San Francisco before heading for the East Coast of the United States.

She transited the Panama Canal on 8 April 1946 and arrived at Norfolk five days later. Westmoreland was decommissioned there on 5 June 1946 and was struck from the Navy List on 19 June.

Commercial service

Acquired by the Isthmian Steamship Company (later called Isthmian Lines) in July 1947, Westmoreland was renamed Steel King. The former attack transport carried general cargo for her company until about 1974, when her name disappeared from contemporary shipping registers.

References

USS Westmoreland (APA-104) Wikipedia