Trisha Shetty (Editor)

USS Quartz (IX 150)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USS Quartz

Out of service
  
31 December 1946

Launched
  
4 December 1943

In service
  
13 April 1944

Struck
  
22 January 1947

Length
  
110 m

USS Quartz (IX-150) httpswwwibiblioorghyperwarUSNshipsimgIX

Builder
  
Barrett and Hilp, Belair Shipyard, San Francisco, California

Fate
  
Sold, 23 October 1947Permanently anchored as a breakwater

USS Quartz (IX-150), a Trefoil-class concrete barge designated an unclassified miscellaneous vessel, was the only ship of the United States Navy to be named for quartz or silicon dioxide (Si02) a hard, vitreous mineral occurring in many varieties and comprising 12% of the earth's crust. Her keel was laid down as MC hull 1330 by Barrett and Hilp, Belair Shipyards, San Francisco, California (T. B7.D1). She was launched on 4 December 1943, and accepted by the Navy and placed in service on 13 April 1944 with Lieutenant Commander Paul N. Runyon in command.

Contents

World War II, 1944–1945

Designed to provide facilities for the issuance of stores at advanced bases, Quartz was assigned to the Service Force, Pacific Fleet (ComServPac). She was towed to Pearl Harbor from San Francisco, arriving on 10 May 1944. Operating with Service Squadrons 8 and 10, she was typical of the "Green Dragons" or "Crockery" ships, which acted as warehouses afloat and packed every conceivable supply item within their holds. She provided services at Majuro, Eniwetok, Ulithi, Leyte, and Guam.

Quartz specialized in the handling of clothing, together with general stores. High speed provision ships made runs to the far reaches of the Pacific, transferred their cargoes to the "crockery" ships, and then returned to the United States for another load without awaiting piecemeal discharge of their cargoes.

Post-war activities and fate, 1945–1947

After V-J Day Quartz was assigned to support "Operation Crossroads", atomic bomb testing. Quartz was part of Task Group 1 and 8, a supply and support group to the testing. After the detonation Quartz was towed to Kwajalein for study and monitoring. After verifying her free of radioactive contamination, the Navy sold her on 23 October 1947 to the Powell River Company of Powell River, British Columbia, where she was permanently anchored with nine other hulks to form a breakwater protecting the Catalyst Paper Mill.

References

USS Quartz (IX-150) Wikipedia