Puneet Varma (Editor)

USS Macdonough (DDG 39)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
Macdonough

Laid down
  
15 April 1958

Decommissioned
  
23 October 1992

Construction started
  
15 April 1958

Length
  
156 m

Displacement
  
5.262 million kg

Namesake
  
Thomas Macdonough

Commissioned
  
4 November 1961

Struck
  
30 November 1992

Launched
  
9 July 1959

Weight
  
5,893 tons

Builder
  
Fore River Shipyard

USS Macdonough (DDG-39) MaritimeQuest USS MacDonough DL8 DLG8 DDG39 Page 1

USS Macdonough (DLG-8/DDG-39) was a Farragut-class guided missile destroyer in the United States Navy. She was named for Commodore Thomas Macdonough was the 4th ship of the United States Navy to be named for him.

USS Macdonough (DDG-39) MaritimeQuest USS MacDonough DL8 DLG8 DDG39 Page 1

Construction and career

USS Macdonough (DDG-39) MaritimeQuest USS MacDonough DL8 DLG8 DDG39 Page 3

The fourth Macdonough was projected as DL-8, but redesignated DLG-8 prior to keel laying by the Fore River Shipyard owned by Bethlehem Steel Co. in Quincy, Massachusetts on 16 April 1958. The ship was launched on 9 July 1959, sponsored by Mrs. Agnes Macdonough Wilson, great-granddaughter of Commodore Thomas Macdonough; and commissioned on 4 November 1961, Comdr. Wm. G. Hurley in command. She was initially rated as a guided missile frigate.

USS Macdonough (DDG-39) MaritimeQuest USS MacDonough DL8 DLG8 DDG39 Page 1

Having undergone an extended shakedown and training period, she reported to her home port at Charleston, South Carolina, 23 September 1962 and assumed duties as flagship for Commander, Cruiser-Destroyer Flotilla 6, U.S. Atlantic Fleet. A month later she joined other units of the U.S. 2nd Fleet in enforcing the Cuban quarantine during the Cuban Missile Crisis, become part of Task Group 136.1 under Rear Admiral John Ailes, Commander, CruDesFlot 6. She remained with that force until it was dissolved on Thanksgiving Day, 22 November. The first 3 months of 1963 were spent firing missiles off the coast of Florida under the auspices of the Operational Test and Evaluation Force. She returned to Charleston in March and operated in the Charleston-Norfolk area until departing on her first U.S. 6th Fleet deployment 4 June.

USS Macdonough (DDG-39) httpsuploadwikimediaorgwikipediacommonsthu

The frigate cruised the Mediterranean Sea until the following fall, taking part in scheduled fleet exercises and training operations. Upon her return to the East Coast of the United States, 26 October, she resumed operations in the Charleston area. With the new year, 1964, Macdonough steamed south to Puerto Rico for training exercises with the 2nd Fleet. During these exercises; she participated in an Atlantic Fleet live-firing anti-air warfare exercise, which included missile firing at drone aircraft. The ship returned to Charleston for 2 weeks in February, and then put out to sea again for carrier exercises off the East Coast followed by helicopter evaluation tests in the Atlantic.

USS Macdonough (DDG-39) FileUSS MacDonough DDG39 1984jpg Wikimedia Commons

Macdonough's second Mediterranean deployment, 10 July to 22 December 1964, was followed by a 6-month overhaul at the Charleston Naval Shipyard. Coastal operations out of home port occupied the frigate until mid-September 1965, when she proceeded to the Atlantic Fleet Missile Range and then to Guantánamo Bay, Cuba, for training exercises. Having returned to her Charleston home port in early November, Macdonough prepared for another Mediterranean deployment, departing Charleston at the end of the month. Macdonough served as flagship for the recovery effort of the Palomares Incident during the third Mediterranean deployment.

On 8 April 1966, Macdonough returned to South Carolina and once again resumed operations and fleet and squadron exercises along the southern east coast and in the Caribbean Sea. During the summer a midshipman training cruise took the frigate to several east coast ports and to the Caribbean. After participating in "LANTFLEX 66," and AAW/ASW/amphibious exercise, she returned to Charleston on 16 December.

After conducting further exercises off the east coast, Macdonough prepared once again for overseas movement; and, on 2 May 1967, she departed Charleston for her fourth Mediterranean cruise. She conducted summer midshipmen training, visited various Mediterranean ports and participate in several joint exercises with ships of allied navies, returning to South Carolina 28 October.

Macdonough continued operating with the 2nd Fleet until May 1968 when she again deployed to the Mediterranean, returning to her home port in September. She remained off the east coast into 1969.

References

USS Macdonough (DDG-39) Wikipedia