John F. Kennedy (CVN-79) is the second Gerald R. Ford-class aircraft carrier being built for the United States Navy. The ship is under construction and planned to be commissioned in 2020.
Contents
Naming
On 7 December 2007, the 66th anniversary of the Attack on Pearl Harbor, Congressman Harry Mitchell (D-AZ) proposed naming this ship USS Arizona. In 2009, Congressman John Shadegg (R-AZ) proposed naming either CVN-79 or the subsequent CVN-80 Barry M. Goldwater, after Barry Goldwater, the late senator from Arizona. On 29 May 2011, the Department of Defense announced that the ship would be named for John F. Kennedy (1917–1963), the 35th President of the United States, who served in the navy during World War II. She will be the third navy ship named after members of the Kennedy family, and the second aircraft carrier named John F. Kennedy, succeeding USS John F. Kennedy (CV-67), which served from 1967 to 2007.
Construction
On 15 January 2009, Northrop Grumman Shipbuilding was awarded a $374 million contract for design work and construction preparation for John F. Kennedy. On 30 September 2010, Northrop Grumman announced a new vice president for the construction of John F. Kennedy, Mike Shawcross, and that preparations were under way to begin construction.
On 25 February 2011, the navy conducted the First Cut of Steel ceremony at Northrop Grumman Shipbuilding in Newport News, signalling the formal start of construction for John F. Kennedy.
John F. Kennedy was originally planned to be completed in 2018. This was extended to 2020 after Secretary of Defense Robert Gates announced in 2009 that the program would shift to a five-year building program so as to place it on a "more fiscally sustainable path". By late 2012, delays had occurred in construction, and the Navy Department was investigating extending the construction time of both the USS Enterprise (CVN-80) and John F. Kennedy by an additional two years which could delay the carrier's entry into service until 2022.
In September 2013, the Government Accountability Office recommended delaying the detail design and construction contract for John F. Kennedy until programmatic shortfalls are sorted out. The Navy and Defense Department have rejected the recommendation. The Navy faces technical, design, and construction challenges to completing USS Gerald R. Ford (CVN-78), including producing systems prior to demonstrating their maturity to meet required installation dates. Gerald R. Ford had costs increase by 22 percent to $12.8 billion, and additional increases could follow due to uncertainties facing critical technology systems and shipbuilder underperformance. Risk is introduced in the navy's plan to conduct integration testing of key systems at the same time as initial operational test and evaluation. One action the GAO says could be taken to ensure Ford-class carrier acquisitions are supported is conducting a cost-benefit analysis of required capabilities and associated costs.
The ship's keel was laid in Newport News, Virginia on 22 August 2015. As part of the traditional keel laying ceremony, the initials of ship sponsor Caroline Kennedy, daughter of President Kennedy, were welded into the ship's hull.