Laid down 12 May 1964 Commissioned 11 October 1969 Launched 22 June 1967 Test depth 396 m | Awarded 5 September 1962 Sponsored by Miss Lori Brinker Construction started 12 May 1964 Length 88 m | |
![]() | ||
USS Grayling (SSN-646), a Sturgeon-class attack submarine, was the fifth ship of the United States Navy to be named for the grayling. Her keel was laid down in 1964, and she was launched just over three years later, and commissioned in 1969. She was involved in the submarine incident off Kola Peninsula on March 20, 1993, when she collided with the Russian Navy submarine Novomoskovsk. She was decommissioned in 1997, and disposed of a year later.
Contents
Construction and commissioning

The contract to build Grayling was awarded on 5 September 1962 and her keel was laid down at the Portsmouth Naval Shipyard at Kittery, Maine, on 12 May 1964. She was launched on 22 June 1967, sponsored by Miss Lori Brinker, the daughter of Lieutenant Commander Robert Brinker, who was commanding officer of the previous USS Grayling (SS-209) when she was lost with all hands in September 1943 during World War II. Grayling (SSN-646) was commissioned on 11 October 1969 with Charles R. Baron in command.
Badge Design, 1981
The colorful Grayling "Badge" logo was designed by Nuclear Trained Machinist Mate Second Class, Gary Helmink, shortly after reporting on board in late 1979. This badge was used thereafter. Gary is a native of Raleigh, NC.
Collision with Russian submarine, 1993

On 20 March 1993, Grayling collided with the Russian Navy submarine Novomoskovsk (K-407), a Delfin-class (NATO reporting name Delta IV-class) ballistic missile submarine north of Murmansk. Grayling had been tracking the Russian unit when the collision happened. The American submarine collided with the starboard bow of Novomoskovsk; neither submarine sustained serious damage.
1993-1997

In June 1996, Grayling took part in Exercise TAPON 96, a North Atlantic Treaty Organization exercise held in the Alboran Sea, Gulf of Cadiz, and eastern Atlantic Ocean, along with the U.S. Navy destroyer USS Conolly (DD-979), the Spanish carrier Príncipe de Asturias, the Spanish frigates Baleares (F71), SPS Santa María (F81), and SPS Numancia (F83), the Spanish submarine SPS Delfin (S61), and the Greek destroyer HS Formion (D220).
Decommissioning and disposal

Grayling was deactivated on 1 March 1997, placed in commission in reserve a week later as she entered the Ship and Submarine Recycling Program, then decommissioned and stricken from the Naval Vessel Register on 18 July 1997. Her scrapping via the U.S. Navy's Ship and Submarine Recycling Program at Puget Sound Naval Shipyard at Bremerton, Washington, was completed on 31 March 1998.
Commemoration
Grayling's sail is now a memorial on the grounds of Portsmouth Naval Shipyard at Kittery, Maine, and her anchor and chain are on display as a memorial in downtown Grayling, Michigan.