Samiksha Jaiswal (Editor)

USNS Bridge (T AOE 10)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
USNS Bridge (T-AOE 10)

Ordered
  
6 December 1989

Laid down
  
2 August 1994

Construction started
  
2 August 1994

Length
  
230 m

Draft
  
12 m

Namesake
  
Horatio Bridge

Awarded
  
15 January 1993

Commissioned
  
5 August 1998

Launched
  
24 August 1996

Displacement
  
44.27 million kg

USNS Bridge (T-AOE-10) httpsuploadwikimediaorgwikipediacommonsthu

Builder
  
National Steel and Shipbuilding Company

Usns bridge t aoe 10 departs pearl harbor during rimpac 2010


USNS Bridge is the fourth ship in the Supply class of fast combat support ships and the second ship in the United States Navy named after Commodore Horatio Bridge. Bridge was commissioned on 5 August 1998.

Contents

USNS Bridge (T-AOE-10) Fast Combat Support Ship AOE Photo Index

1990s

USNS Bridge (T-AOE-10) FileUSNS Bridge TAOE10 in December 2009jpg Wikimedia Commons

Her commissioning CO was CAPT Robbie Williams (a SWO). The second CO was CAPT (now RADM) Rick Wren. In June 2001, CAPT (later VADM) Carol Pottenger relieved CAPT Wren. Bridge made four deployments as a commissioned warship.

2000s

USNS Bridge (T-AOE-10) USNS Bridge TAOE10 departs Pearl Harbor during RIMPAC 2010 YouTube

On 29 June 2004, Bridge was formally decommissioned and transferred from the United States Navy to the Military Sealift Command. Although the transfer to MSC occurred on 29 June 2004, the ceremony took place on 24 June 2004 (which is why the two dates are often interchanged). Bridge no longer carries the weapons systems she had been equipped with. As a commissioned warship, Bridge was equipped with two Phalanx Block 1 CIWS mounts, one NSSM launcher (with two Mk 91 directors), two Mk. 38 25-mm chain guns, six .50 caliber heavy machine gun mounts, and two M-60 mounts (on the bow), in addition to the Beretta M9s, M-14s, and 12-gauge Mossberg shotguns issued to the watch standers.

2010s

USNS Bridge (T-AOE-10) FileUSNS Bridge TAOE10jpg Wikimedia Commons

In March 2011, in company with the carrier Ronald Reagan, the ship was deployed off northeastern Honshu, Japan to assist with relief efforts after the 2011 Tōhoku earthquake and tsunami. One interpretation of multiple surveys and repeated tests for traces of radiation was suggested to indicate that during that time, the ship was not exposed to any leaking radiation from the Fukushima I nuclear accidents, however, the ship was then quickly decommissioned. Bridge conducted 25 underway replenishment operations, delivering more than 1.8 millions gallons of fuel in support of Operation Tomodachi.

USNS Bridge (T-AOE-10) USNS Bridge TAOE 10 arrives in Pearl Harbor for RIMPAC 2010 YouTube

In April 2013, it was announced that the MSC will take USNS Bridge and USNS Rainier (T-AOE 7) out of service in 2014 as a cost-saving measure. The ships' gas turbine propulsion make them faster than other Navy supply ships, but also make them consume more fuel.

As of 2016, USNS Rainier remains in active service, but Bridge is inactive.

USNS Bridge (T-AOE-10)

References

USNS Bridge (T-AOE-10) Wikipedia