Harman Patil (Editor)

Two Arena Central

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Under construction

Elevation
  
142m

Height
  
55 m

Architecture firm
  
MAKE Architects

Current tenant
  
HSBC Bank (2018)

Country
  
England, UK

Current tenants
  
HSBC UK (2018)

Town or city
  
Birmingham

Construction started
  
September 2015

Two Arena Central arenacentralcomwpcontentuploads201507banne

Type
  
Grade A Offices, Retail, Restaurant

Location
  
Arena Central, Broad Street

Similar
  
Alpha Tower, Paradise - Birmingham, 103 Col Row, Curzon Street railway st, Chamberlain Square

Two Arena Central is a 55 metres (180 ft), eleven storey building currently under construction between Alpha Tower and the former Birmingham Municipal Bank headquarters on Broad Street in Birmingham, England. The building will serve HSBC Bank as their UK headquarters for the personal and business banking operations.

Contents

Two Arena Central Two Arena Central plans for Broad Street offices and apartments

HSBC

Two Arena Central New Arena Central plans reveal urban meadow Birmingham Post

In 2015 HSBC Bank completed the deal to forward purchase the building on a 250-year lease which will house UK business and personal banking services with up to 1,000 staff. The deal is the largest property deal in Birmingham since 2002.

History of the site

Two Arena Central 1 Arena Central Arena Central Birmingham

The development of the site started when the Birmingham Canal was cut in 1768-72. Its terminal basin, named Old Wharf, was located at the rear of the proposed building. The site was occupied by the Eagle Iron Foundry during the 19th century up until 1926 when it was cleared and replaced by the Masonic Hall. The building formed the southern part of the Civic Centre masterplan with the Municipal Bank built in 1933 to its west. The Freemasons occupied the hall until 1939 when it was acquired by the government during World War II to be used by the Ministry of Food and the War Office for Army Recruitment. The hall was later adapted in the 1970s to form part of the ATV studio complex. The hall was demolished in 2006 ahead of the proposed Arena Central development project.

Construction

Two Arena Central Mixeduse City Development Arena Central Birmingham

On 7 September 2015, representatives from Miller Developments undertook a groundbreaking ceremony to signal the start of the construction phase.

Two Arena Central Green light for new HSBC head office at Arena Central Birmingham Post

Two Arena Central Pictures Arena Central from above Birmingham Mail

Two Arena Central Mixeduse City Development Arena Central Birmingham

Two Arena Central Project

References

Two Arena Central Wikipedia