Kalpana Kalpana (Editor)

Turin–Milan high speed railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
0.00
  
Torino Porta Nuova

6.204
  
Torino Dora

4.233
  
Torino Porta Susa

10.898
  
Torino Stura

1.092 0.000
  
to Pinerolo and Torre Pellice/Genoa

1.465
  
to Bardonecchia and France

The Turin–Milan high-speed railway line is a link in the Italian high-speed rail network. It is part of Corridor 5 of the European Union's Trans-European high-speed rail network, which connects Lisbon and Kiev. The section between Turin and Novara opened on 10 February 2006, while the remainder opened on 5 December 2009.

The route is 125 kilometres (78 mi) long (98 kilometres (61 mi) in Piedmont and 27 kilometres (17 mi) in Lombardy) and crosses the territory of 41 municipalities. The estimated cost of the works is €2,580 million (€20.6 million per kilometre). The flatness of the countryside has allowed 80% (approximately 100 km) of the track to be built at ground level, with a small amount of line built in cuttings, approximately 15% (about 20 kilometres (12 mi)) on viaducts, and about 5% (nearly 5 kilometres (3.1 mi)) in cut-and-cover tunnel. Among the most important structures is the 3.8 kilometre-long Santhià Viaduct and the 600 metre-long Pregnana Milanese Tunnel. Most of the line closely follows the south side of the Milan-Turin Autostrada.

The 85-kilometre (53 mi) section between Turin and Novara was inaugurated on 10 February for the 2006 Olympics in Turin. The 40-kilometre (25 mi) section between Novara and Milan was officially opened on 5 December 2009.

References

Turin–Milan high-speed railway Wikipedia