Neha Patil (Editor)

Tseung Kwan O Line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Rapid transit

Opened
  
4 August 2002

System
  
MTR

Stations
  
8

Tseung Kwan O Line wwwlaingorourkecommedialorimagesprojectsp

Locale
  
Districts served: Eastern, Kwun Tong, Sai Kung

Termini
  
North Point Po Lam / LOHAS Park

Ridership
  
333,300 daily average (weekdays, September 2014)

Mass transit railway hd c stock tseung kwan o line train departs north point station


The Tseung Kwan O Line is one of the eleven lines of the MTR system in Hong Kong, indicated by the colour purple. It is currently 12.3 kilometres (7.6 mi) long, taking 15 minutes to travel throughout the entire line.

Contents

Tseung Kwan O Line Highways Department Tseung Kwan O Line

The line runs from North Point on the Hong Kong Island to the new town of Tseung Kwan O. It bifurcates east of Tseung Kwan O Station into two branches, one northward to Po Lam and one southward to LOHAS Park. The Tseung Kwan O Depot at LOHAS Park is responsible for the maintenance of the line's rolling stock.

Tseung Kwan O Line Tseung Kwan O Line Laing O39Rourke

During the morning peak period, the Tseung Kwan O Line uses 15 trains to maintain a frequency of 2.5 minutes.

Tseung Kwan O Line Tseung Kwan O Line

Wms 9 mtr tseung kwan o line from po lam to north point


Route descriptions

Tseung Kwan O Line Tseung Kwan O Line Wikiwand

Tseung Kwan O Line is the first MTR line with no tracks on viaducts. It was the only line with tracks completely in tunnels until the completion of LOHAS Park station, near which there are two short sections that are not in tunnels. The stations of Yau Tong, Po Lam and LOHAS Park are at ground level, but are completely shielded to minimise noise to the surrounding development. The rest of the line has its tracks located underground.

Tseung Kwan O Line FileTseung Kwan O Linesvg Wikimedia Commons

The western terminus of the line is North Point, providing cross-platform interchange together with the neighbouring station of Quarry Bay. East of Quarry Bay, the line passes under Victoria Harbour to Yau Tong Station, a station serving the East Kowloon neighbourhood of the same name, using the rail tunnel of the Eastern Harbour Crossing. From Yau Tong, the line passes through the Black Hill Tunnels to enter Tseung Kwan O New Town at Tiu Keng Leng.

Tseung Kwan O Line MTR Tseung Kwan O Line K Train Passing Tiu Keng Leng Off Service

Within Tseung Kwan O new town, the line splits into two branches east of Tseung Kwan O Station. One branch reaches Hang Hau and Po Lam stations in the northern part of the new town, whereas the southward branch connects LOHAS Park Station in Area 86. LOHAS Park is a large-scale residential development built above the Tseung Kwan O Depot, where the trains of the line are maintained.

Train operations

As the line splits into two branches at Tseung Kwan O, the operation of the line is relatively complex when compared to other lines of the MTR.

The majority of trains on the line run through from Po Lam to North Point and vice versa. Through service between LOHAS Park and North Point is only provided during rush hour; during non-peak period, LOHAS Park is only served by "shuttle trains" terminating at Tiu Keng Leng, operating at 12-minute intervals. Passengers travelling to and from LOHAS Park during non-peak hours are required to change trains at Tiu Keng Leng or Tseung Kwan O in order to continue their journey.

Train headways are as follows:

  • Rush hour: One through train to/from LOHAS Park after two trains to/from Po Lam
  • North Point - Po Lam trains: every 2.5 or 4 minutes
  • North Point - LOHAS Park trains: every 7-8 minutes
  • combined headway between North Point and Tseung Kwan O is 2.5 minutes.
  • Non-peak period:
  • Mon-Fri, Sat (10:00-20:00) and Sun (09:00-20:00)
  • North Point - Po Lam trains: every 2-4 minutes
  • Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
  • No through service from LOHAS Park to North Point, vice versa
  • Every day between 20:00 and 00:00
  • North Point - Po Lam trains: every 2.5 - 5 minutes
  • Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
  • No through service from LOHAS Park to North Point, vice versa
  • Every day after 00:00
  • North Point to Po Lam trains: every 6 minutes
  • Po Lam to North Point trains: every 8-9 minutes
  • Tiu Keng Leng - LOHAS Park shuttle trains: every 12 minutes
  • History

    The Tseung Kwan O Line was planned to serve the new town of Tseung Kwan O and was first proposed in 1981 as part of the Junk Bay New Town Transport Study. The report proposed four corridors, all of which called for the Kwun Tong Line to be extended to Lam Tin Station and placed the terminus of the Tseung Kwan O Line at the vicinity of Tsui Ping Estate. The construction cost was estimated at three billion Hong Kong dollars. The construction of the Tseung Kwan O Line was approved by the Hong Kong Government in 1985 and under the 1985 plan, a 7 km (4.3 mi) branch line from Lam Tin Station to Tseung Kwan O Station, consisting of 5 or 6 stations, was to be built beginning in 1992 and to open by the end of 1996. This plan was cancelled by the MTR Corporation in August 1990.

    MTR re-proposed the line in 1993, and the plan was approved by the Hong Kong Executive Council on 20 October 1998. Construction commenced on 24 April 1999 and the line opened on 18 August 2002, at a cost of 18 billion Hong Kong dollars. The new line took over the cross-harbour segment, via the Eastern Harbour Tunnel to North Point station, from the Kwun Tong Line. The Kwun Tong Line was extended to Yau Tong and Tiu Keng Leng stations to interchange with the new line.

    Trains

    The line is served by K-Stock and M-Trains (G-Stock, H-Stock and Q-Stock). The K-Stock trains were manufactured by a consortium of Hyundai Rotem and Mitsubishi Corporation, and were expected to be quieter and to use energy generated from deceleration.

    Although tailor-made for the line, the K-Stock trains actually ran on the Kwun Tong Line from launch through April 2010, and the original M-Trains ran on this line instead. The K-Stock trains were finally transferred to this line in April 2010.

    Stations

    The following is a list of the stations on the Tseung Kwan O Line.

    Future development

    The Tseung Kwan O Line will probably be extended to Tamar Station and interchange with an extended Tung Chung Line there. This is according to the "interchange scheme" devised for the North Island Line, which would also see the line serve stations at Causeway Bay North and Exhibition, the latter of which would provide a connection with the Sha Tin to Central Link extension of the future North South Corridor. Construction is not expected to begin before 2021.

    Under an earlier proposal, called the "swap scheme", the line would have taken over the section of the Island Line from Tin Hau to Kennedy Town; with the remaining section east of Tin Hau being transferred to the Tung Chung Line. This was rejected as the existing Island Line would be interrupted and require an interchange.

    References

    Tseung Kwan O Line Wikipedia